Similar Projects
Cold Patch Asphalt
Term Contract
Bidding
Sarasota, FL

Concrete, Asphaltic Hot Mix, Asphalt and Tack, County Pick-Up
Term Contract
Bidding
FL

Quicklime
Term Contract
Post-Bid
Melbourne, FL 32901

Cover Dirt For Lena Road Landfill
Post-Bid
FL

Rock Crushing
Results
Ochopee, FL

Infield Mix (Clay) and Top Dressing Sand
Results
Less than $100,000 est. value
FL

Limerock Purchase and Delivery for Lochloosa Wildlife Conservation Area
Term Contract
Bidding
Palatka, FL

Cold Mix Rejuvenating Additive
Post-Bid
FL

Rip Rap, Aggregates, and Road Base Materials
Results
FL

Provision of 57 Stone
Term Contract
Bidding
Kissimmee, FL

Crushed Road Base Material
Term Contract
Post-Bid
Bartow, FL 33831

FL, Merritt Island NWR,119 Biolab Rd ERF
Results
Merritt Island, FL

Clean Fill Dirt Delivered, Compacted and Graded
Term Contract
Bidding
FL

Ready-Mix Concrete - Supply and Deliver
Term Contract
Post-Bid
Port Charlotte, FL 33948

Road Base Material for Blackwater State Forest
Results
FL

Reported 03/19/2022 12:00 AM
Project Title

Recycled Concrete Crushing at Perdido Landfill

Physical Address View project details and contacts
City, State (County) FL   (Escambia County)
Category(s) Heavy and Highway
Sub-Category(s) Aggregates
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall process up to 8,000 cubic yards of concrete rubble stockpiled at the Perdido Landfill. 1. Contractor shall supply the equipment necessary to process the recycled concrete rubble to an approximate size of 1.5”. 2. Contractor shall supply dust control throughout the processing. 3. Materials other than the concrete shall be removed and set aside. Disposal of materials other than concrete shall be the responsibility of Waste Services. The disposal will be at no cost to the Contractor. 4. Waste Services shall pay for the crushed concrete based on the weight verification process agreed upon between the Contractor and Waste Services. 5. Contractor will have access to site 7:00 a.m. through 5:00 p.m. Monday through Friday. 6. Please read through the Operations Plan document which describes Contractor permit requirements. 7. Contractor shall supply a quote based on a per-ton price. 8. Contractor to provide a timeframe to complete processing.

Details

Division 32 - Exterior Improvements, Common Work Results for Exterior Improvements, Aggregates for Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents