Project Title | Pad 107 and 2023 Cap Construction |
Physical Address | View project details and contacts |
City, State (County) | Boyertown, PA 19512 (Berks County) |
Category(s) | Single Trades |
Sub-Category(s) | Service/Term Contracts |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Delaware County Solid Waste Authority (DCSWA) will receive Proposals to construct, as requested, for a term of one (1) year, Pad 107 and 2023 Cap, at Delaware County Solid Waste Authority, Rolling Hills Landfill, Earl Township, Berks County, Pennsylvania All questions must be submitted electronically CLARIFICATION DEADLINE 12/16/2022 12:00 PM The Bid must be accompanied by Bid Security made payable to OWNER, in the amount of ten percent (10%) of the total amount Bid in the form of Official Bank Check, Cash, Certified Good Faith Check, Irrevocable Letter of Credit or a Bid Bond issued by a Surety meeting the requirements of paragraph 4.1 of the Procurement General Conditions. Failure to accompany the Bid with the above described Bid Security will automatically disqualify Bidder. The scope of the project is generally summarized as the earthwork and geosynthetics construction for a 1.5 acre cell and 5.8 acre cap. Cell construction includes removal of overburden, installation of structural fill/subgrade/subbase soils to design elevation and grade, anchor trench construction, installation of the geosynthetic liner system, leachate collection piping, construction of protective cover layer, and installation of stormwater conveyance structures. Cap construction will include installation of select intermediate cover soil, installation of the geosynthetic cap system, installation of drainage piping, placement of final cover soil, and construction of a stormwater letdown. The CONTRACTOR will be responsible for all materials, equipment and labor necessary to execute the requirements of this project. The Schedule is as defined in the Contract Documents. The operation of heavy equipment and machinery may be performed between 6:00 a.m. and 8:00 p.m. Monday through Friday, and 6:00 a.m. to 2:00 p.m. on Saturdays. Other hours are subject to approval by the OWNER. The OWNER notes that all construction activities will be regulated by the Pennsylvania Department of Environmental Protection (PaDEP). Personnel from the PaDEP will visit the site at random times to complete inspections. In addition, the quality of all work will be verified by third party construction quality assurance. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |