Similar Projects
Demolition and Site Restoration of 2518 Chatham Street
Demolition - 4,200 SF
Bidding
Cincinnati, OH 45206

Sources Sought Notice for Bureau of Indian Affairs (BIA) Demolition Indefinite
Demolition
Post-Bid
$25,000 to $200,000,000 est. value

Demolition and Site Restoration of 3413 Marmet Avenue
Post-Bid
Cincinnati, OH 45220

Demolition - 75-7.85 Demo 1
Results
OH

Demolition and Site Restoration of 1848 Baltimore Avenue
Demolition - 5,000 SF
Results
Cincinnati, OH 45202

Demolition and Site Restoration of 4711 Wilmer Court
Demolition - 2,000 SF
Post-Bid
Cincinnati, OH 45226

Demolition and Site Restoration of 3316 Fairfield Avenue
Demolition
Results
Cincinnati, OH 45202

Demolition and Site Restoration of 4323 Eastern Avenue
Demolition - 1,600 SF
Results
Cincinnati, OH 45202

Demolition and Site Restoration of 1673 Dewey Avenue
Demolition - 1,500 SF
Results
Cincinnati, OH

Demolition and Site Restoration of 1633 Waverly Avenue
Demolition - 1,500 SF
Results
Cincinnati, OH 45202

Demolition and Site Restoration of 1620 Sutter Avenue
Demolition - 1,540 SF
Results
Cincinnati, OH 45202

Demolition and Site Restoration of 862 Hutchins Avenue
Demolition - 3,800 SF
Results
Cincinnati, OH

Demolition and Site Restoration of 542 Hale Avenue
Demolition - 2,600 SF
Results
Cincinnati, OH

Demolition and Site Restoration of 1321 Carolina Avenue
Demolition, Term Contract - 1,400 SF
Results
Cincinnati, OH 45202

Demolition and Site Restoration of 1632 Denham Street
Renovation, Demolition, Term Contract - 1,600 SF
Results
Cincinnati, OH 45202

Last Updated 07/13/2020 04:16 PM
Project Title

Curnett Property Demolition

Physical Address View project details and contacts
City, State (County) Harrison, OH   (Hamilton County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $16,779
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall perform the following: 1) Contractor shall provide a Temporary orange fence around the trees in the work area for protection against construction traffic. Trees to be protected will be marked in yellow caution tape. 2) Demo and haul off all interior furnishings, hvac, plumbing, electrical distribution systems, exterior walls, interior walls, framing, foundations, floor slabs, roof system, doors and windows around the entire facility. 3) Demo all hard ceilings, trusses, including all exterior soffits and gutters. 4) Demo and haul off the kitchen equipment, countertops, etc. 5) Demo and haul off all restroom fixtures, counter tops, partitions and accessories. 6) Demo and remove all electric conduits, wiring, devices, panels, sub panels back to the existing transformer and haul off site. 7) Demo, remove and haul off all sanitary lines and cap including all vent lines. Provide a CCTV camera inspection of the sanitary lines at both buildings to locate the sanitary collecting systems and remove the systems per EPA guidelines. 8) Demo, remove and haul off all water lines back to the end and cap line. Meter shall be removed by the contractor and or the utility company. Contractor shall be responsible to verify and include. 9) Remove the split rail fence and the block landscaping island at the 350 Willow Ln address. Use the best rails to replace missing rails at the main entrance fencing and discard the remainder. Fill and grade the edges of the raised landscaping area after removal of the block wall to maintain the same elevation and cover with topsoil to match existing topography. Maintain the trees at this elevated area. Use caution as the overhead power line is to remain intact as the line is still active and feeds the adjoining property. 10) Demo, remove and haul off all HVAC equipment, electric, duct work and all air devices along with water heater system. HVAC contractor shall capture all refrigerant prior to demolition of HVAC equipment. 11) Contractor is to limit all Demo traffic to the paths outlined in orange paint to avoid damages and rutting to soft areas. Avoid damages to tree roots. 12) Upon completion, all that shall be remaining of the abandoned structures is an 18” over burden of topsoil uncompacted to allow trees and vegetation to establish in a natural fashion. 13) Contractor is to remove any fire pits, trash, tires, etc. to leave the site in clean condition. Fill any holes to grade even with surrounding area. 14) Contractor shall restore all grass areas disturbed by demolition and establish new seeding at the demolished building sites. Install erosion matting pinned in place and install seed (species is to be provided by Great Parks of Hamilton County to match local flora). This includes all fine grading, seed and straw. Contractor shall limit the damage as much as possible to tree roots and adjacent vegetation. 15) Contractor shall repair / restore any damage due to demolition. (IE. Gravel drive entrance, split rail fence at entrance and entrance gate that is to remain upon completion). 16) Install silt fence along the bank of the Miami White water River for the entire length of the property approximately 10 ft from the edge of the depression. 17) Contractor will be responsible for all barricades around the demolition area to keep the public away from the site and post warning signs accordingly. 18) All work is to be completed per Stream Bank Stabilization Nationwide permit 13 (through Army Corps of Engineers).

Details

Division 02 - Existing Conditions, Demolition.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents