Similar Projects
Wrightsville Beach CSRM
Design
$10,000,000 to $25,000,000 est. value
Wrightsville Beach, NC

Savannah Harbor DMCA 1N Dike Raising
Design
$1,000,000 to $5,000,000 est. value
Port Wentworth, Savannah, GA

Salters Creek Maintenance Dredging
Post-Bid
Beaufort, NC 28516

Straits Landing Channel Maintenance Dredging
Post-Bid
Beaufort, NC 28516

Post-Florence Renourishment Project Phase 1
Results
Less than $19,579,550 est. value
Indian Beach, NC

Wilmington Harbor Mid-River and Military Ocean Terminal, Sunny Point Dredging
Results
$10,000,000 to $20,000,000 est. value
Wilmington, NC

Maintenance Dredging Wilmington Harbor Anchorage Basin 42 Foot & 32 Foot Project, New Hanover and Brunswick Counties, North Carolina
Design
$5,000,000 to $10,000,000 est. value
Wilmington, NC

W912PM20B0012 - Coastal Storm Risk Management Bogue Banks Sources Sought
Post-Bid
$25,000,000 to $50,000,000 est. value
Atlantic Beach, Emerald Isle, Indian Beach, Pine Knoll Shores, Salter Path, NC

Maintenance Dredging - MHC Inner Harbor
Results
$1,000,000 to $5,000,000 est. value
Morehead City, NC 28557

Brunswick Inner Harbor Maintenance Dredging - Task Order
Post-Bid
$1,000,000 to $5,000,000 est. value
Brunswick, GA

Post-Florence Beach Renourishment Project Phase 2
Results
Less than $31,632,750 est. value
Emerald Isle, NC

FY20 Savannah Inner Harbor Maintenance Dredging
Post-Bid
$10,000,000 to $25,000,000 est. value
Savannah, GA 31401

Atlantic Harbor Maintenance Dredging and Living Shoreline
Results
Less than $1,949,188 est. value
Beaufort, NC 28516

Coastal Storm Risk Management (CSRM) Bogue Banks, Carteret County, N.C.
Post-Bid
NC

South Atlantic Division Regional Harbor Dredging Contract FY21
Results
$10,000,000 to $25,000,000 est. value
Brunswick, Savannah, GA - Morehead City, Wilmington, NC

Last Updated 10/22/2020 01:58 PM
Project Title

South Atlantic Regional Harbor Dredging

Physical Address View project details and contacts
City, State (County) Brunswick, Savannah, GA - Morehead City, Wilmington, NC (Chatham, Glynn (GA) - Carteret, New Hanover (NC) Counties)
Category(s) Heavy and Highway
Sub-Category(s) Dredging
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide maintenance dredging for (4) dredging projects. The areas of consideration for these dredging services are: Brunswick Harbor, Georgia; Savannah Harbor, Georgia; Wilmington Harbor, North Carolina; and Morehead City Harbor, North Carolina. Brunswick Harbor, Georgia Estimated Quantity: 810,000 CY Environmental Window: December 1 - April 15 The work for Brunswick Harbor for maintenance dredging will require a hopper dredge(s). The dredge(s) must have the capability to dredge fine sands and silts to a depth of -40 MLLW and to transport the dredged sediment up to 15 miles to the dump location. Dredged material shall be placed in the Brunswick Ocean Dredged Material Disposal Site (ODMDS). Disposal shall be within a specific area within the Brunswick ODMDS identified by USACE in conjunction with EPA, Region 4 in order for disposal monitoring to be effective. The bin restrictions for the Brunswick ODMDS are as follows: Reach Bin Restriction -19+000 to -23+000 11,500 CY -23+000 to -28+000 8,860 CY -28+000 to -33+500 9,300 CY -33+500 to -56+500 7,000 CY Savannah Harbor, Georgia Estimated Quantity: 1,005,000 CY Environmental Window: December 1 - April 15 The work for Savannah Harbor for maintenance dredging will require a Hopper dredge(s). The dredge(s) must have the capability to dredge fine sands and silts to a depth of -51 MLLW and to transport the dredged sediment up to 15 miles to the dump location. Dredged material shall be placed in the offshore disposal areas. Disposal shall be within a specific area within the Ocean Dredged Material Disposal Site (ODMDS) identified by USACE in conjunction with EPA, Region 4 in order for disposal monitoring to be effective. The bin restriction for the Savannah ODMDS is 12,500 cubic yards. Wilmington Harbor, North Carolina Estimated Quantity: 920,000 CY Environmental Window: December 1 - April 15 The work for Wilmington Harbor Outer Ocean Bar shall consist of maintenance dredging of Wilmington Harbor Baldhead Shoal Channel Reach 3, Southport Channel and Battery Island Channel. The maintenance dredging will require removal and disposal of shoaled material that has accumulated in the channels since they were last dredged. The dredging shall be performed by hopper dredge. Dredging depth is 44' plus 2' of allowable over depth. The Government furnished disposal area is the Wilmington Harbor Ocean Dredged Material Disposal Site. Morehead City Harbor, North Carolina Estimated Quantity: 750,000 CY Environmental Window: December 1 - April 15 The work for Morehead City Harbor shall consist of maintenance dredging of the Morehead City Harbor Cutoff and Range A. The maintenance dredging will require removal and disposal of shoaled material that has accumulated in the channels since they were last dredged. The dredging shall be performed by hopper dredge. Dredging depth is 45 feet plus 2 feet of allowable overdepth. Disposal of dredged material will be in the Nearshore Placement Areas and/or the Morehead City Ocean Dredged Material Disposal Site.

Details

Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Dredging.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents