Similar Projects
Roofing Envelope Services
Post-Bid

Roofing Systems, Exterior Building Maintenance
Term Contract
Post-Bid

Basement Seepage Remediation
Results
Less than $600,000 est. value
Saint Charles, IL 60175

Replace Roofing Systems Statewide, Phase I
Results
Less than $2,000,000 est. value

Roofing Repair and Maintenance
Post-Bid

Facade Repairs
Results
Batavia, IL 60510

Elgin Mental Health Center Roof Repair & Maintenance
Term Contract
Post-Bid
Elgin, IL 60123

Autumn 2020 Roofing Improvements
Results
Aurora, IL 60506

Aluminum Window and Roofing - Summer 2021 Renovations
Post-Bid
Burlington, IL 60109

2020 Ceramics Building Exterior Renovation
Renovation
Results
Sugar Grove, IL 60554

Legacy Mural
Alteration
Post-Bid
Aurora, IL 60505

Dundee-Crown High School Roof Work
Results
Carpentersville, IL 60110

Batavia Public Works Garage Roof Repair
Alteration
Post-Bid
Batavia, IL 60510

High School Roof Deck Repair
Results
Aurora, IL 60505

Gutter Repair and Installation
Term Contract
Post-Bid
Algonquin, IL

Last Updated 12/20/2021 09:44 AM
Project Title

Hillcrest Elementary School Fascia Removal And Replacement

Physical Address View project details and contacts
City, State (County) Elgin, IL 60123   (Kane County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior, Roofing
Contracting Method Competitive Bids.
Project Status Project Delayed, Project to Rebid
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove the existing fascia panels and snap-on fascia at the perimeter of the building which is approximately 1500 Ft. This needs to be field measured by the bidding contractor for square footage verification. Install ice and water shield at the work area. Fabricate and install 24-gauge prefinished steel standing seam panels with water table flashing at the bottom and a new outer color piece of snap-on fascia on the top using starter piece. Color will be selected from standard color selection. A standard color chart needs to be provided by the winning contractor for selection by School District. This bid needs to include all materials and labor needed to complete this fascia replacement including backing boards if needed.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Roof Specialties, Manufactured Gravel Stops and Fasciae.
Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents