Similar Projects
RFQ Design - CDBG Possum Hollow Park Lighting
Infrastructure
Conception
$400,000 CJ est. value
Slidell, LA 70458

I-12: LA 1077 to LA 21
Demolition, New Construction, Infrastructure
Design
$70,000,000 CJ est. value
Mandeville, LA 70471

Grafton Drive Pavement Rehabilitation
Infrastructure
Design
$1,000,000 CJ est. value
Slidell, LA 70458

Henry Road Safety Widening: LA 73 To Tillotson and Aikens Road Clearing and Grubbing
Infrastructure, Alteration
Post-Bid
$350,000 to $500,000 est. value

Reiher Road Drainage
Infrastructure
Post-Bid
$120,000 CJ est. value
Mandeville, LA 70471

Home Elevation Services
Renovation
Results
Less than $350,000 est. value
Mandeville, LA

Civil Site Work for Three Artificial Turf Fields, STPSB Project
Infrastructure
Results
LA

Slidell Memorial Hospital SMH Three Story Building Addition
Addition, Demolition, Infrastructure
Construction
$36,000,000 CJ est. value
Slidell, LA 70458

Station 19 Fire Station
New Construction, Infrastructure
Construction
$1,493,300 CJ est. value
Slidell, LA 70461

Medline Distribution Center
New Construction, Infrastructure - 800,000 SF
Pending Verification
$53,000,000 CJ est. value
Covington, LA 70433

Lakeshore Villages Phase 9-C
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Slidell, LA 70458

Black Bayou Br Near Madisonville
Demolition, New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Covington, LA 70433

Comprehensive Cancer Care Clinic
New Construction, Infrastructure - 2,947 SF
Post-Bid
$400,000 est. value
Slidell, LA 70458

Pecan Acres Subdivision Home Demolition And Slab Removal
Demolition
Results

Lakeshore Villages, Phase 13
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Slidell, LA 70458

Last Updated 01/18/2023 10:38 AM
Project Title

Bonterra Subdivision, Phases 2 and 3

Physical Address View project details and contacts
City, State (County) Pearl River, LA 70452   (Saint Tammany County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $19,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a residential subdivision. As of January 18, 2023, a building permit has not been issued at this time. Information regarding an architect and a general contractor has not been disclosed. A firm construction timeline has not been confirmed. * *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents