Similar Projects
Hickory Village at Lake Gentry
New Construction, Infrastructure
Conception
$212,400,000 CJ est. value
Saint Cloud, FL 34772

Hickory Village at Lake Gentry
New Construction, Infrastructure
Conception
$212,400,000 CJ est. value
Saint Cloud, FL 34772

SkydiveXperience
New Construction, Infrastructure - 30,000 SF
Design
$45,000,000 CJ est. value
Kissimmee, FL 34747

SkydiveXperience
New Construction, Infrastructure - 30,000 SF
Design
$45,000,000 CJ est. value
Kissimmee, FL 34747

Neptune Road Widening from Partin Settlement to South of Kings Crest Road
Infrastructure
Bidding
$500,000 CJ est. value
Kissimmee, FL 34744

Neptune Road Widening from Partin Settlement to South of Kings Crest Road
Infrastructure
Bidding
$500,000 CJ est. value
Kissimmee, FL 34744

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Storcon Self-Storage Facility
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Buena Ventura Lakes, FL 34743

Central Florida Rail Corridor (CFRC) Lake Monroe Drawbridge Painting
Infrastructure
Results

Construction Services for Simpson Road Widening Phase I Project
Infrastructure
Results
$15,000,000 est. value
Kissimmee, FL 34746

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Encompass Health Rehabilitation Hospital of Kissimmee Phase 1
New Construction, Infrastructure - 52,470 SF
Construction
$35,000,000 CJ est. value
Kissimmee, FL 34746

Canoe Creek Road Widening Project - Osceola County
Infrastructure
Pending Verification
$700,000 CJ est. value
Saint Cloud, FL 34773

Canoe Creek Road Widening Project - Osceola County
Infrastructure
Pending Verification
$700,000 CJ est. value
Saint Cloud, FL 34773

Cyrils Drive Widening from Narcoossee to Absher - County Of Osceola -
Infrastructure
Conception
$5,000,000 est. value
Saint Cloud, FL 34771

Last Updated 10/06/2023 08:16 AM
Project Title

Construction Services for Kissimmee to St. Cloud Connector Trail Project

Physical Address View project details and contacts
City, State (County) Kissimmee, FL 34741   (Osceola County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected November 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Pursuant to the Osceola County Procurement Code and all applicable Florida Statutes Osceola County is accepting sealed formal bids for the project known as the Construction Services for Kissimmee to St. Cloud Connector Trail Project (Federal-Aid Funded - LAP) FM#439067-1-58-01 / D522-077-B. Scope of Service: The proposed Kissimmee St. Cloud Connector Trail project is a 1.47-mile-long concrete shared-use path varying in width from 8 ft to 14 ft with approximately 80% of the trail at 14 ft wide. The pavement design for the path includes 4 inch, 6 inch, and 6 inch reinforced concrete. There is a 1,133 ft long section of the trail that runs through the Disston Sugarmill Ruins area, which is a protected area. There is no excavation or grubbing permitted in this area. The trail is to be constructed by laying down a geotextile fabric layer, placing and compacting 4 inches of recycled concrete aggregate base, and constructing 4 in thick concrete trail. Otherwise, this Ruins area is to remain undisturbed. There are four designated areas of subsoil excavation. There are four locations calling for the construction of concrete gravity walls. The plans include the construction of drainage features including 14 inlets, 6 manholes, 1 endwall, and 10 mitered end sections as well as 2,166 ft of drainage pipe. The plans call for the milling and resurfacing of the northbound lanes of Brown Chapel Rd. The appropriate traffic control will be in place for this roadway resurfacing operation. The plans include details for providing permanent tree protection barricades. The section of the trail under the US 192 (SR 500) bridge includes the addition of underdeck lighting. Note: there is no access to the trail project from US 192 to under the bridge. This project is a Federal-aid funded project through the Florida Department of Transportation (FDOT) Local Agency Program (LAP), (FM#439067-1-58-01 / D522-077-B). FDOT Pre-Qualification Requirements: The prime Contractor shall be Florida Department of Transportation (FDOT) Prequalified in the following Work Groups: 7. Drainage 10. Flexible Paving 11. Grading 12. Grassing, seeding and sodding 40. Sidewalk 40. Driveways The County reserves the right to reject any or all bids received in accordance with Section 3.4-5 of the Procurement Code. Rejections shall be for good cause, in whole or in part, and with proper notifications and documentation. The deadline for questions is Tuesday, July 25, 2023 at 12:00 PM Local Time. Contact: Don Gaskins (407) 742-0931. **American Persian Engineering And Construction requests sub bids no later than September 11, 2023.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents