Similar Projects
Reported | 10/27/2021 12:00 AM |
Project Title | Demolition, Clean Up, Restoration, and Legal Removal of Debris |
Physical Address | View project details and contacts |
City, State (County) | Woodstock, IL (McHenry County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Demolition, Hauling |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected November 2021 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work consists of the legal demolition, removal and disposal of the structures located on the subject properties. The structures included but are not limited to single family residences, accessory buildings, associated foundations, slabs, footings, driveways, walkways, decks/porches, culvert(s), electric service, gas service, water well, septic system and appurtenances. The removal and legal disposal of any tree, shrub or other vegetation that impedes or may impede the ability to complete the work and any other trees taken down in the course of demolition will be at the contractor’s expense. Once the demolition and removal is complete the site shall be restored by grading the site to tie into the existing adjacent grades and drainage ditches, six inches (6”) of topsoil applied, turf grass seed applied and erosion control blankets installed as part of this bid. The work includes the carrying out of all duties and obligations and the furnishing of all labor, material, tools, equipment, and other incidentals necessary or convenient to the successful completion of the project. The contractor shall be responsible for obtaining all required permits prior to the commencement of related work. Receipts for disposal of materials, equipment and debris and refuse shall be provided with each invoice. Landfill or scrap yard must be used. All items shall be removed from the site. All recyclables must be properly recycled, there is not guarantee of the dollar values for salvage by the contractor. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |