Similar Projects
Miscellaneous Contracted Services
Bidding
Leander, TX 78641

Road and Highway Equipment
Term Contract
Sub-Bidding
Austin, TX 78701

Automotive Lifts
Post-Bid
Austin, TX 78767

Water and Wastewater Pumps and Motors
Alteration
Post-Bid
Austin, TX

Walk Thru Metal Detectors (WTMD)
Results

West Travis County Public Utility Agency Wastewater Solids Dewatering Equipment
Alteration
Results
$739,000 est. value
Bee Cave, TX 78733

Utility Tractor
Alteration
Post-Bid
Austin, TX

Filter Air Cartridge 24IN X24IN X12IN GT HP-100 CL2
Alteration
Post-Bid
Austin, TX

Fitness Equipment, Installation, And Onsite Maintenance Service
Alteration
Post-Bid
Austin, TX

New Truck Wash Equipment (Installation and Maintenance)
Term Contract
Post-Bid
Austin, TX 78744

Fy22 Genie Boom Lift Repair
Term Contract
Post-Bid
San Antonio, TX 78275

Compact/Mini Excavator
Alteration
Post-Bid
Austin, TX

Kitchen Equipment
Alteration
Post-Bid
$43,837 est. value
Austin, TX

Maintenance and Repair of Off-Road Construction and Related Equipment
Alteration
Post-Bid
Austin, TX

Construction, Road and Bridge, and Other Related Equipment
Term Contract
Post-Bid
Austin, TX

Last Updated 01/18/2023 11:33 PM
Project Title

Main Campus (CAM): Replace Existing Campus Proprietary Monitoring System

Physical Address View project details and contacts
City, State (County) Austin, TX 78701   (Travis County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $793,956 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Main Campus (CAM) - Replace existing campus proprietary monitoring system. New campus-wide system to utilize IP network technology to report fire alarm signals to UL Listed Workstations. Project to be completed in phases. Existing system to be kept online until each installation phase is complete, at which point the existing equipment corresponding with the completed phase will be decommissioned. The budget range for the project is approximately $650,000.00 to $750,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The project schedule is to complete the project prior to 180 Calendar days from issuance of Notice to Proceed.

Details

Division 11 - Equipment, Operation and Maintenance of Equipment, Vehicle Service Equipment, Maintenance Equipment, Unit Kitchens, Residential Equipment, Residential Appliances, Agricultural Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents