Similar Projects
Last Updated | 03/22/2022 10:31 AM |
Project Title | Cooling Coil Replacements - Minneapolis Convention Center |
Physical Address | View project details and contacts |
City, State (County) | Minneapolis, MN 55403 (Hennepin County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | To provide all materials, labor, equipment, permits and incidentals necessary for Cooling Coil Replacement Project for the Minneapolis Convention Center. A. The work in this contract comprises of supplying and installing new heavy gauge copper cooling coils in the listed HVAC units at the MCC. The vendor shall provide all tools and equipment to perform the installation of appropriately sized cooling coils in each specified HVAC unit. All work associated with the installation shall be performed by the vendor. This should include any crane/rigging services to locate the materials at the MCC and any modifications/preparations in the penthouse areas. This work will also include placing the old coils on the ground in an area specified by the MCC. B. All Branch valves shall be replaced C. Additional Supply valves shall be installed at a location determined by the MCC D. Additional Return valves shall be installed at a location determined by the MCC E. All related piping shall be insulated. F. Cooling coils shall be Type L heavy gauge copper. G. Contractor shall perform all necessary connections to existing MCC equipment. H. Contractor will verify the proper measurements of all new coils. I. Coordination of all work performed with MCC Project Manager. J. Start and test unit for proper operation K. Report any findings or deficiencies to client L. Complete clean up by contractor after work complete. M. HVAC units covered in this scope are: Expansion AHU’s: #2 Upper Coil #3 Upper Coil #11 Both Coils #12 Both Coils #14 Both Coils #17 Both Coils #21 Both Coils #22 Both Coils Pre-Expansion AHU’s: #2 #4 #29 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |