Similar Projects
ASL Asphalt Entrance Rebuild
Bidding
Albuquerque, NM 87196

Roadway Construction and Storm Drainage
Post-Bid
Bernalillo, NM 87004

Construction Services
Post-Bid
Bernalillo, NM 87004

Southern Boulevard Restoration
Results
Less than $1,981,378 est. value
Rio Rancho, NM 87144

Lincoln Avenue Improvements - Phase 2
Results
$3,773,327 to $6,056,408 est. value
Rio Rancho, NM 87144

Romero Road Maintenance Access Project
Post-Bid
Rio Rancho, NM 87124

Rainbow North Field Parking Lot Repaving
Results
$90,000 est. value
Rio Rancho, NM 87124

Cochiti Roadway Maintenance Project
Post-Bid
Cochiti, NM

Santa Fe Hills Boulevard Reconstruction Project
Results
$1,250,000 est. value
Rio Rancho, NM 87144

Indefinite Quantity (Idiq) Multiple Award Construction Contract (Macc) For Paving Projects At Various Government Installations Within The Navfac Sw Area Of Responsibility Including But Not Limited To California, Arizona, Nevada, Utah, Colorado, And New Mex
Post-Bid

Southern Boulevard Phase II Patching Project
Results
Less than $1,040,978 est. value
Rio Rancho, NM 87144

Base Course Fill
Post-Bid

Cabezon Boulevard Patching
Results
$330,380 est. value
Rio Rancho, NM 87144

Residential Streets Rehabilitation
Post-Bid
Cochiti, NM

Broadmoor Boulevard Extension Project
Results
$1,829,000 est. value
Rio Rancho, NM 87144

Last Updated 05/10/2021 06:24 AM
Project Title

Design Services and Corridor Study for Idalia Road

Physical Address View project details and contacts
City, State (County) Rio Rancho, NM   (Sandoval County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consultant to provide preliminary design services and a corridor study for Idalia Road from Northern Boulevard to Iris Road in accordance with all New Mexico Department of Transportation (NMDOT), Federal Highway Administration (FHWA) and City requirements. The project is preliminary engineering, including a corridor study, of Idalia Road from Northern Boulevard to Iris Road. The Consultant shall be responsible for all studies, surveys, analysis, coordination, engineering, and all other necessary documents to complete the preliminary design, right-of-way mapping, traffic analysis, determine level of environmental documentation for final design (including any requirements from State Historical Preservation Office - SHPO), and future construction costs, including costs for landscaping. It is the intent of the City that the Consultant will have full latitude and complete responsibility for developing this project, with guidance and final decision making by the City. The Consultant shall designate a project manager to be the sole point of contact to the City’s project manager. Change in Consultant’s project manager during the project will require written approval by the City’s project manager before the proposed change is made.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents