Similar Projects
RFQ Engineering - Greene Street Pump Station and Force Main
Infrastructure
Conception
$300,000 CJ est. value
Greenville, NC 27834

SCADA Building for the Old Tar Gate Station Site
New Construction, Infrastructure
Design
$300,000 CJ est. value
Greenville, NC 27858

Gymnasium and Special Needs Facility/Winterville - Pitt County
New Construction, Infrastructure - 56,000 SF
Design
$6,500,000 CJ est. value
Winterville, NC 28590

Wildwood Park Bridges and Boardwalks
Infrastructure
Bidding
$2,000,000 CJ est. value
Greenville, NC 27834

Community Center and Gymnasium for Alice Keene District Park
New Construction, Infrastructure
Bidding
$2,900,000 CJ est. value
Greenville, NC 27858

Eakin SRC HVAC Repairs and Gym Floor Replacement
Renovation
Post-Bid
$4,200,000 CJ est. value
Greenville, NC 27858

Forlines Pump Station and Force Main Improvements
New Construction, Infrastructure
Post-Bid
Greenville, NC 27858

Southeast Service Area Sanitary Sewer Improvements
Infrastructure
Results
$6,298,238 CJ est. value
Greenville, NC 27858

Taxiway A North Rehabilitation
Infrastructure
Results
$3,927,793 CJ est. value
Greenville, NC 27834

East Bend Trace
New Construction - 92,226 SF
Construction
$8,020,067 est. value
Greenville, NC 27858

Ridgewood Farms
New Construction, Infrastructure
Construction
$47,700,000 CJ est. value
Winterville, NC 28590

Dickinson Avenue Apartment Complex
New Construction, Infrastructure
Pending Verification
$57,000,000 CJ est. value
Greenville, NC 27834

Wastewater Tank - Greenville Utilities Commission
Demolition, New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Greenville, NC 27858

Gymnasium in the Alice F. Keene District Park - Pitt County
Addition, Infrastructure
Design
$3,700,000 CJ est. value
Greenville, NC 27858

RFQ Contractor - Greenville Utilities Commission, Section 14 Streambank and Shoreline Erosion Protection Project
Infrastructure
Bidding
$5,000,000 CJ est. value
Greenville, NC 27834

Last Updated 09/12/2023 12:08 PM
Project Title

Community Center and Gymnasium for Pitt County Office Park Complex

Physical Address View project details and contacts
City, State (County) Greenville, NC 27834   (Pitt County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Clubhouse/Social Club, Fitness Center, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $2,900,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

All Contractors are hereby notified that they must have proper license under the State laws governing their respective trades. General Contractors are notified that Chapter 87, Article l, General Statutes of North Carolina, will be observed in receiving bids and awarding the General Contract. General Contractors submitting bids on this project must have proper license classification. Each proposal shall be accompanied by a cash deposit or a certified check drawn on some bank or trust company insured by the Federal Deposit Insurance Corporation, of an amount equal to not less than five percent (5%) of the proposal, or in lieu thereof, a bidder may offer a bid bond of five percent (5%) of the bid executed by a surety company licensed under the laws of North Carolina to execute such bonds, conditioned that the surety will, upon demand forthwith make payment to the obligee upon said bond if the bidder fails to execute the contract in accordance with the bid bond. Said deposit shall be retained by the Owner as liquidated damages in event of failure of the successful bidder to execute the contract within ten days after the award or to give satisfactory surety as required by law. In determining the value of the bid bond, additive or deductive alternates shall be considered as they are accepted by the Owner. A Performance Bond and a Labor and Materials Payment Bond will be required for one hundred percent (100%) of the contract price. Payment will be made on the basis of ninety-five percent (95%) of monthly estimates and final payment made upon completion and acceptance of work. No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of 30 days after the bid date. The Owner reserves the right to reject any or all bids and to waive informalities.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents