Similar Projects
Baltzell Lift Station Elimination
Bidding
Anniston, AL 36202

Construction of Water and Sewer Line at Jeff Met West Industrial Park
New Construction, Infrastructure
Bidding
AL

New Industrial Area Booster Pump Station
Post-Bid
Decatur, AL 35609

New Pumping Station (Contract C)
Post-Bid
Irvington, AL 36544

Duck River Reservoir Phase II - Raw Water Pump Station
Results
Less than $10,590,800 est. value
Cullman, AL 35055

Eslava Lift Station Bar Screen Replacement
Results
Mobile, AL

Rehabilitation of Pumping Station No. 2
Post-Bid
Less than $110,000 est. value
Samson, AL

Improvements to the Lakewood Pump Station
Results
Less than $679,675 est. value
Dothan, AL 36303

2020 Sanitary Sewer Lift Station Improvements
Post-Bid
Less than $300,000 est. value
Hayneville, AL 36040

Dog River Lift Station Relocation
Results
Less than $800,119 est. value
Mobile, AL 36605

2020 Miscellaneous Pump Station Improvements (Pump Station 25, 31, and 37) Project
Post-Bid
Less than $2,500,000 est. value
Montgomery, AL 36109

Eslava Creek 48in Force Main Replacement Phase III 1-A Broad Street to Baker Street
Results
Less than $4,300,000 est. value
Mobile, AL

USDA Crown Castle 500,000 Gal EWT and CR 266 300,000 Gal EWT and USDA Water System Improvements
Post-Bid
Less than $2,200,000 est. value
Valley, AL 36854

Phase 1 - Water & Sewer Improvements to Serve John Soules Food
Results
Less than $2,200,000 est. value
Valley, AL

Wastewater Treatment Plant Upgrades
Post-Bid
Less than $1,500,000 est. value
West Blocton, Woodstock, AL

Last Updated 06/28/2021 02:19 PM
Project Title

West Catoma Pump Station (102A) Improvements

Physical Address View project details and contacts
City, State (County) Montgomery, AL   (Montgomery County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,760,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the following major components: 1. Demolition of existing extended-shaft centrifugal pump and installation of four new dry-pit submersible pumps and associated piping. 2. Installation of new slide gates in pump station wet well. 3. Installation of eight new variable frequency drives, new power distribution to new pumps, and replacement of miscellaneous power and control panels. 4. Structural rehabilitation of the pump station wet well concrete substrate and application of corrosion resistant coating in wet well. 5. New interior and exterior structural steel. 6. New traveling bridge crane and monorail hoists. 7. Miscellaneous architectural improvements to include new pump station roof, doors, guard railing, and new elevator system. 8. New ventilation system to include new supply fans, exhaust fans, and interior ductwork. 9. Temporary by-pass pumping of raw sewage around large pump station where work is being conducted

Details

Lift and Pump Stations, Demolition.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents