Similar Projects
PBSO, District 6 - Chiller Replacement
Bidding
Lake Worth, FL 33467

WUD, WTP 3 - Exhaust Fans Replacement
Term Contract
Bidding
Delray Beach, FL 33446

Cooling Tower Replacement
Post-Bid
Less than $2,700,000 est. value
Boca Raton, FL 33431

PBSO Real Time Crime Lab - HVAC Upgrades
Term Contract
Post-Bid
West Palm Beach, FL 33406

PBSO District 3 - HVAC Replacement
Term Contract
Results
West Palm Beach, FL

2019 Commercial Pool Cooler
Results
North Palm Beach, FL 33408

Library Gruber Sandbox Building LY - 3
Post-Bid
Boca Raton, FL 33431

Hagen Ranch Road Library - Chiller Replacement
Results
Delray Beach, FL 33446

Pahokee Housing Authority Padgett Island / Fremd Village HVAC Project
Post-Bid
Pahokee, FL 33476

GCC - Air Handler Unit #11 Replacement
Term Contract
Results
West Palm Beach, FL 33401

Building 12 Animal Lab Renovation
Post-Bid
Boca Raton, FL 33431

MCCH - HVAC Replacement AHU #27
Term Contract
Results
West Palm Beach, FL 33401

Commercial Pool Cooler System
Post-Bid
North Palm Beach, FL 33408

MCCH - HVAC Replacement AHU #28
Term Contract
Results
West Palm Beach, FL 33401

HVAC and Air Duct Replacement and Installation
Term Contract
Post-Bid
West Palm Beach, FL 33415

Last Updated 02/12/2020 10:34 AM
Project Title

Governmental Center (GCC) HVAC Replacement AHU 3N

Physical Address View project details and contacts
City, State (County) West Palm Beach, FL 33401   (Palm Beach County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove the existing Air Handler Unit 3. Any wall demo, if necessary, will be determined at the pre-bid meeting and the responsibility of the contractor. Replace with Trane, or PBC approved equal b. The new specified unit is shorter and narrower than the existing unit, and may allow for removal of the 16” tall piers that support the existing unit. The existing VFD will be replaced with a new, like kind, 20hp drive based on the three 7.5 hp motor configuration. c. Duct cleaning shall be included for this system. Duct cleaning of the first 10’ of supply duct or to turning vanes if inside first 10’. d. Replace all actuators, valves and temperature gauges with new. e. Replace fresh air dampers.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents