Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Woodland Dentistry / Alexandria
New Construction, Infrastructure - 10,518 SF
Sub-Bidding
$6,100,000 CJ est. value
Alexandria, MN 56308

Alomere Health Rehab Services - BP 1
New Construction, Infrastructure - 28,581 SF
Sub-Bidding
$3,500,000 CJ est. value
Alexandria, MN 56308

North Smoky Hills Graveling
Renovation
Post-Bid

North Smoky Hills Graveling
Renovation
Post-Bid

CSAH 9 Grading
Results
$959,092 est. value
MN

2021 Paving Projects
Results
$6,413,876 est. value
MN

Intersection Improvements - TH 27
Infrastructure
Conception
$2,600,000 est. value
Osakis, MN 56360

Road Right-of-Way Maintenance Equipment
Infrastructure
Post-Bid

Various Highways in MnDOT District 4, 6 and 8 Pedestrian Head Replacement
Results

Township Roads Maintenance
Term Contract
Post-Bid
Alexandria, MN

CSAH 8 and 40 Roundabout
Results
$1,168,151 est. value
MN

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

Township Road Improvements
Infrastructure
Results
Miltona, MN

Last Updated 08/08/2022 08:39 AM
Project Title

18th Avenue Reconstruction

Physical Address View project details and contacts
City, State (County) Alexandria, MN 56308   (Douglas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $7,023,910 [brand] Estimate
Plans Available from Civil Engineer - 04/15/22
Owner View project details and contacts
Architect View project details and contacts
Description

Major items include the following approximate quantities: 25,700 CY Common Excavation 12,500 CY Select Granular Embankment 8,800 CY Aggregate Base Class 5 6,700 SY Full Depth Bituminous Reclamation 7,100 TON Type SP 12.5 Wearing Course Mixture (3,C) 8,800 LF Concrete Curb & Gutter 39,000 SF Concrete Walk 4,900 LF RC Pipe Sewer 6,300 LF PVC Pipe Sewer 2,900 LF PVC Watermain STATE PROJECT NO. 102-123-002, 102-102-002, 102-112-009 and 102-116-005, 2020-11741, 21028

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents