Similar Projects
Elmwood Estates Addition - City of Broken Arrow
Infrastructure
Conception
$312,000 est. value
Broken Arrow, OK

Turtle Creek Phase 2 - City of Broken Arrow
Alteration
Conception
$365,400 est. value
Broken Arrow, OK

Pavement Rehabilitation
Infrastructure
Design
$22,434,951 CJ est. value
Tulsa, OK 74110

Pavement Rehabilitation
Infrastructure
Design
$22,434,951 CJ est. value
Tulsa, OK 74110

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Commercial Inspection Facility
New Construction, Infrastructure - 300 SF
Post-Bid
$5,000,000 CJ est. value
Tulsa, OK 74115

Concrete Roadway Panel Replacement with Additional Miscellaneous Concrete Work 3
Infrastructure
Results
$809,281 est. value
Broken Arrow, OK

East Elementary Driveway Entrance Improvements
Alteration
Results
Tulsa, OK 74137

Jenks Speech Therapy
New Construction, Infrastructure - 6,080 SF
Construction
$1,300,000 CJ est. value
Jenks, OK 74037

Jenks Speech Therapy
New Construction, Infrastructure - 6,080 SF
Construction
$1,300,000 CJ est. value
Jenks, OK 74037

WeConnect Office Expansion
Demolition, Renovation, Infrastructure - 866 SF
Pending Verification
$40,000 CJ est. value
Tulsa, OK 74137

The Enclave at Southern Trails
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Broken Arrow, OK 74011

South Aspen Avenue Mixed Use Project Development
New Construction, Infrastructure - 260,000 SF
Conception
$132,000,000 CJ est. value
Broken Arrow, OK 74011

I-44 - Utilities
Infrastructure
Design
$2,074,299 CJ est. value
Tulsa, OK 74145

Highway Sweeping Services
Infrastructure
Post-Bid

Last Updated 11/15/2022 10:01 AM
Project Title

Intersection Modification and Traffic Signals City Street (South Memorial Drive)

Physical Address View project details and contacts
City, State (County) Tulsa, OK 74133   (Tulsa County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $899,657 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Intersection Modification and Traffic Signals City Street (South Memorial Drive): at the Intersection of East 126th Street South in Bixby. Project Length = 0.33 Mile Counties: Tulsa Calendar Days: 120 Submit Any Questions or Concerns to the Office Engineer Division via: - Email: Odot-prebid.question@odot.org - Phone: (405) 521 - 2625 Each Bid Shall Be Accompanied by a Certified or Cashier's Check or Bid Bond Equal to 5% of the Bid Made Payable to the State of Oklahoma, Department of Transportation, as a Proposal Guaranty. Proposal Checks Will Be Held or Returned by the Department as Per Subsection 103.04 of the State Standard Specifications. ODOT- Call Order 222 - Intersection Modification and Traffic Signals City Street (South Memorial Drive)

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents