Similar Projects
STH 40 - Tilden Construction / Pavement Replacement
Infrastructure
Conception
$2,000,000 CJ est. value
Bloomer, WI 54724

Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

Engineering, Planning and Development
Post-Bid

Architect-Engineering (AE) Indefinite Delivery Contract (IDC) in Support of the Defense Health Agency (DHA) and Component Medical Commands
Post-Bid
Less than $45,000,000 est. value
Washington, DC

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Results
$70,000 to $10,000,000 est. value
Washington, DC

IDIQ Contract for Architect-Engineer Services for Compliance with Air Emission Regulations, EPCRA Regulations, Greenhouse Gas & All Other Environmental Media Regulations
Post-Bid

National Architecture/Engineering/Interiors (IDIQ) Contract
Results
Less than $25,000,000 est. value

Architect and Engineering Services for Production Technical Services (PTS) for FEMA's Risk MAP Program
Post-Bid
$10,000 to $300,000,000 est. value

Ancillary Structure Rehab / Replace 2021, Locations on STN Per Annual Plan
Results

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Indefinite Delivery Indefinite Quantity Architectural-Engineering Contracts
Results

C1JZ--National Region AE IDIQ
Post-Bid
$20,000,000 est. value

Well No. 5 Pump House and Site Improvements
Infrastructure
Results
Lake Hallie, WI

C--Multiple Award Task Order Contract (MATOC)
New Construction, Term Contract
Post-Bid

Last Updated 08/01/2022 03:33 PM
Project Title

RFQ Engineering - NR Northern Region Bridge Repair Replacements

Physical Address View project details and contacts
City, State (County) Jim Falls, WI 54748   (Chippewa County)
Category(s) Heavy and Highway, Professional Services
Sub-Category(s) Bridge, Engineering, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $688,500 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT DESCRIPTION: Three (3) bridges within Brunet Island State Park, one (1) small pedestrian bridge will need to be replaced and two (2) vehicle bridges will need repair; One (1) bridge at Council Grounds State Park will need to be replaced, culvert alternatives need to be investigated during preliminary design to determine most economical crossing type; One (1) bridge along the Bearskin State Trail will need to be replaced. PROJECT SCHEDULE: A/E Selection Aug, 2022 Design Report Jun, 2023 SBC Approval Aug, 2023 Bid Opening Jan, 2024 Construction Start Jun, 2024 Substantial Completion Nov, 2024 Project Closeout Apr, 2025

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents