Similar Projects
Last Updated | 09/12/2022 01:05 PM |
Project Title | Wallace Street Reconstruction Phase II |
Physical Address | View project details and contacts |
City, State (County) | Sterling, IL 61081 (Whiteside County) |
Category(s) | Heavy and Highway, Outdoor Lighting, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Results, Construction start expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $3,051,452 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project Category Code: Street/Road Lane Construction and Repair - Wallace Street and Avenue B Description: Includes reconstruction and realignment of Wallace Street from IL 40 to Avenue B including the construction of a round-about. This work includes storm and sanitary sewer improvements, concrete and hot-mix asphalt paving, stamped concrete pavement, sidewalks, brick sidewalks, landscape improvements, street lighting, and other miscellaneous roadway items. Bidders shall be IDOT prequalified and shall supply current Certificate of Eligibility before acceptance of their Bid Proposal. The Contractor shall complete the substantial portions of this contract on or before JULY 4th, 2023. The remaining off main-line work shall be completed on or before AUGUST 4TH, 2023. LOCATION OF PROJECT The project is located within the limits of the City of Sterling, Illinois (Owner). This project is located in the Northwest quarter of Section 28, Township 21 North, Range 7 East of the 4 th Principal Meridian. The Wallace Street project ends at 1st Avenue (Station 5013+72.33) and begins west of Avenue B, 2,172.33 feet west of 1 st Avenue, (Station 4992+00.00). The net length of the project is 2,172.33 feet (0.41 miles). DESCRIPTION OF PROJECT This project consists of the removal and re-alignment of Wallace Street west of Avenue B to 1st Avenue, and the replacement of the intersection of Avenue B and Wallace Street with a Round About. Roadway work consists of pavement, driveway and sidewalk removal, earthwork, storm sewer, aggregate subbase, Concrete and Hot-Mix Asphalt pavement, pavement markings, sidewalks, watermain, storm sewer, landscaping restoration & seeding, street lighting and electrical, and other various roadway items. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |