Similar Projects
Improve Safety on Us-119 Through the Gateway Industrial Park to Us-23, Including Us-23 Flyover Ramp
Infrastructure
Conception
$18,340,000 CJ est. value
Whitesburg, KY 41858

Improve Safety on Us-119 Through the Gateway Industrial Park to Us-23, Including Us-23 Flyover Ramp
Infrastructure
Conception
$18,340,000 CJ est. value
Whitesburg, KY 41858

Road Maintenance and Repair
Design
Blacksburg, Covington, Edinburg, Harrisonburg, Marion, Natural Bridge Station, Wise, VA

Barkley Dam Replace Foundation Drainage System
Infrastructure
Design
$500,000 CJ est. value
Grand Rivers, KY 42045

Installing a New Overlay on the Tennis Courts at Robert Westrick Memorial Park
Infrastructure
Bidding
$500,000 CJ est. value
Carrollton, KY 41008

East Marshall New Fire Station
New Construction, Infrastructure
Bidding
$4,700,000 CJ est. value
Gilbertsville, KY 42044

Hot-mix Asphalt
Term Contract
Sub-Bidding
Covington, KY 41011

Jessamine County Judicial Center - Site Demolition Package
Demolition, Infrastructure
Sub-Bidding
$60,000 CJ est. value
Nicholasville, KY 40356

Road Stabilization
Post-Bid
Williamsburg, KY 40769

Asphalt
Infrastructure
Post-Bid
KY

Asphalt Paving, Sealcoat & Striping
Term Contract
Results
KY

Mayfield Bikeway
Results
Mayfield, KY

OMS Steel Fabrication Facility
New Construction, Infrastructure - 130,000 SF
Pending Verification
$5,500,000 CJ est. value
Lexington, KY 40505

Design and Construct a Sound Barrier Wall on the South Side of I-71
Infrastructure
Conception
$1,160,000 CJ est. value
Louisville, KY 40241

LG&E Carrollton Operations Center
New Construction, Infrastructure - 10,500 SF
Bidding
$2,000,000 CJ est. value
Carrollton, KY 41008

Last Updated 08/04/2022 08:02 AM
Project Title

Widen Ky-1991 From Maysville Road to Midland Trail Industrial Park, Montgomery County

Physical Address View project details and contacts
City, State (County) Mount Sterling, KY 40353   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $3,230,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Widen Ky-1991 From Maysville Road to Midland Trail Industrial Park, Montgomery County. (See 7-8501.00 for "Spb" Funds) (2005hpp-ky129) Milepoints: From MP 0.000 To 1.768 Purpose and Need: Major Widening(O) As of August 04, 2022, the project is in conceptual status. Anticipated Letting Year is 2023. KYTC - Widen Ky-1991 From Maysville Road to Midland Trail Industrial Park, Montgomery County *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents