Similar Projects
LED Lighting Upgrade
Term Contract
Bidding
Appleton, WI

District Wide Bottle Filler Stations at Central Region Locations
Alteration
Bidding
Milwaukee, WI

Replace Boilers B415
Post-Bid
$10,000,000 to $20,000,000 est. value
Tomah, WI 54660

Plasma Disinfection Modifications
Post-Bid
Waukesha, WI 53146

Air Handling Unit Replacement
Results
$240,000 est. value
Barron, WI 54812

Stack Replacements
Results
Less than $375,000 est. value
Milwaukee, WI

2021 Electric Cable Replacement
Alteration
Bidding
Oconomowoc, WI 53066

Time & Material Plumbing
Term Contract
Post-Bid
Milwaukee, WI

New PV Solar Array at Fire Station No. 8
Results
Eau Claire, WI 54703

Rosalind Apartments Living Unit Lighting Replacement Project
Alteration
Bidding
Fond du Lac, WI 54935

Purchase of Light Fixtures for South Division HS - Lobby 1-2 Lighting Upgrade
Post-Bid
Milwaukee, WI 53204

2021 Fiber Projects
Renovation
Results
Madison, WI

Bid Package 2 - District Wide Bottle Filler Stations at Southwest Locations
Alteration
Bidding
Milwaukee, WI 53228

Plumbing Service
Term Contract
Post-Bid
Columbus, WI

Central Maintenance Facility Fire Alarm and Lighting Upgrades
Results
Eau Claire, WI 54703

Last Updated 06/24/2021 01:15 PM
Project Title

ADA Accessible Elevator Addition - MEP

Physical Address View project details and contacts
City, State (County) Delavan, WI 53115   (Walworth County)
Category(s) Single Trades
Sub-Category(s) Electric, Mechanical, Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $520,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general the work consists of constructing a new (3) stop elevator addition adjacent to the existing stairway area of Pie Hall on the School for the Deaf campus. The new elevator will provide an internal accessible path for wheelchairs between the primary school and other campus buildings. Currently, wheelchair students must traverse an outdoor sidewalk to access campus buildings including food services and the health center. A new stairway addition, adjacent to the new elevator shaft and meeting current building code guidelines, will be constructed to connect the upper and lower levels of Pie Hall with the intermediate ground level. Site, mechanical, electrical, and plumbing are also part of the project scope

Details

Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents