Similar Projects
Moore's Creek Advanced Water Resource Recovery Facility Miscellaneous Concrete Repair - Rivanna Water and Sewer Authority
Infrastructure
Conception
$2,400,000 est. value
Charlottesville, VA 22902

Cleaning and Inspection of the ACSA's Water Storage Tanks
Post-Bid
Charlottesville, VA

Water Tank Fall Protection Systems Annual Inspections and As Needed Repair Services
Term Contract, Infrastructure
Post-Bid
Fairfax, VA

World-Wide Water Storage Tank Remediation
Term Contract
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

Huguenot Road Pump Station and Tank
Construction
Chesterfield, VA 23832

Brine Storage Tank - Pittsylvania County
Infrastructure
Post-Bid
VA

Hampton Boulevard Water Storage Tank
Results
Less than $6,350,000 est. value
Norfolk, VA 23505

Creighton Road WST Recoating and Rehabilitation
Infrastructure, Alteration
Post-Bid
Mechanicsville, VA 23111

BLRI 2021 Cyclic Water Tank Cleaning
Results
VA

Jennings Randolph Lake RWCC Water Storage Tank Replacement
Alteration
Post-Bid
Hampton, Newport News, VA

Construction of the Eagle Rock Water Storage Tank Replacement
Results
$300,000 to $399,999 est. value
Eagle Rock, VA 24085

Wilson Road Water Tank Rehabilitation
Renovation
Post-Bid
Smithfield, VA

Modifications, Supports and Installation of Water Tank
Results
$20,000 est. value
Eastville, VA

Mayfield and Food Lion Elevated Tanks TTHM Removal System
Infrastructure
Post-Bid
$250,000 est. value
South Hill, VA

Reported 07/18/2022 09:05 AM
Project Title

Water Tank Rehabilitation - U0005 - City of Lynchburg

Physical Address View project details and contacts
City, State (County) Lynchburg, VA 24504   (Lynchburg City County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $1,901,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Department of Water Resources has developed a 5 year program for inspection of the City's water storage tanks. Each tank is inspected inside and outside by a tank coating specialist every 5 years and routine maintenance, including removing and applying coating paint is scheduled based on these recommendations. Project is included City of Lynchburg - Procurement FY 2023-2027 Budget CIP . As of July 16, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents