Similar Projects
Paving at Boiling Springs High School Freshman Academy
Results
Spartanburg, SC 29316

Rehabiliation/Reconstruction - Spartanburg County
Results
SC

Road S-569 (Sunny Acres Road) at SC Route 150 Intersection Improvement Project
Results
Spartanburg, SC

2021 Municipal, C-Funds and Road Fee Resurfacing Project
Results
Spartanburg, SC

Collection and Distribution Complex Paving Project
Results
Spartanburg, SC 29306

Site Station Resurfacing Project
Results
Spartanburg, SC

Reclamation And Resurfacing Project Scdot S42-644, Robinson Road
Results
Spartanburg, SC

Rehabilitation - S-172
Results
SC

District Wide Paving Project
Results
Boiling Springs, Chesnee, Cowpens, Inman, SC 29349

Jesse Boyd Asphalt Removal and Replacement
Infrastructure
Results
Spartanburg, SC

2021 Annual Street Resurfacing Project
Infrastructure
Results
$1,200,000 est. value
Spartanburg, SC

Safety Improvements - Spartanburg/Greenville County
Infrastructure
Results

Willis Road Widening Project
Infrastructure
Results
Spartanburg, SC 29301

Reconstruction Rehabilitation - Spartanburg Co
Infrastructure
Results
SC

Tyger River Park Asphalt Repairs
Infrastructure
Results
Duncan, SC 29334

Reported 03/18/2022 12:00 AM
Project Title

Old Asheville Highway Widening Project

Physical Address View project details and contacts
City, State (County) Campobello, SC   (Spartanburg County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $70,000 to $100,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Widening and resurfacing of an existing portion of Old Asheville Hwy. Widening and resurfacing of a portion of the existing Old Asheville Hwy. The project is for widening of Old Asheville Hwy and will include the excavation of 4 feet wide for the placement of 6 inches of asphalt base on the let side (from north to south) and a 2-inch overlay of the project area (20' x 1430'). Upon completion of asphalt, the shoulders on both sides of the project will need to be built back and any disturbed areas are to be seeded. Shoulder material shall be screened topsoil. Along the let side of the project shall also include the cleaning out of the existing ditch to ensure proper drainage and seeded upon completion along the 1430 t of the proposed widening. Use portable traffic control, warning signs and flaggers as necessary. The project will start at approximately 1130 t. south of the intersection of Asheville Hwy and Old Asheville Hwy near the baseball Fields for Landrum High School. The start is at Control Point 0+00.00 and end at 14+30.00 both areas are marked with paint and a nail in the center of the roadway. 0+00.00 is located north of 485 Old Asheville Hwy. 14+30.00 is located just south ofthe intersection ofOld Asheville Hwy and Cane Creek Way

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents