Similar Projects
Reported | 02/12/2020 12:00 AM |
Project Title | Palmer Middle School Flooring Replacement |
Physical Address | View project details and contacts |
City, State (County) | Kennesaw, GA 30144 (Cobb County) |
Category(s) | Single Trades |
Sub-Category(s) | Flooring |
Contracting Method | Competitive Bids. |
Project Status | Accepting Qualifications |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Architect/Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project consists of, but is not limited to, the demolition of the existing finish flooring and base material including Vinyl Composite Tile (VCT) and Carpet. Testing for relative humidity, the preparation of existing floor substrate, application of leveling compound, application of adhesives and installation of new Luxury Vinyl Tile (LVT), Tile Carpeting, and base material including transition strips and accessories. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |