Similar Projects
Lighting Project Public Safety Complexes
Bidding
Scituate, RI 02857

LED Lighting Project Camp Fogerty Armory
Bidding
East Greenwich, RI 02818

Public-Private Partnership for Virtual Net Metered Renewable Energy Project
Post-Bid
Scituate, RI 02857

River's Edge Solar Project
Post-Bid
Woonsocket, RI

Scalabrini Piazza Lighting Improvement
Results
Providence, RI 02909

Virtual Net Metered Renewable Energy Project
Results
Coventry, RI 02816

Community Center Emergency Power Stand-By Generator
Bidding
Narragansett, RI

Replacement of Transformers at the Fox Point Hurricane Barrier, Providence, RI
Post-Bid
$1,000,000 to $5,000,000 est. value
Providence, RI

Schneider Electric UPS Maintenance Renewal
Results
Less than $6,200 est. value
Warwick, RI

Maintenance of Two Wind Turbines at Fisherman's Memorial and East Matunuck Beach
Term Contract
Post-Bid
Narragansett, RI 02882

Trailer Mounted LED Light Towers with Built In 6000W Generator
Results
Providence, RI

Emergency Generator Inspection and Repair
Post-Bid
Johnston, RI 02919

Back-Up Generator/Equipment Maintenance and Service
Results
Westerly, RI

On Call Electrical Services
Post-Bid
North Kingstown, RI 02852

300 HP Variable Frequency Drive Replacement, Station 1 Water Treatment Plant
Results
Less than $50,000 est. value
Newport, RI

Last Updated 11/24/2020 09:56 AM
Project Title

Pier 2 Electrical Utility Project

Physical Address View project details and contacts
City, State (County) Newport, RI 02841   (Newport County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes the repair of Load Center 2 and incidental related work. Repairs within Load Center 2 include the following: removal and replacement of the two 13.8kV primary/ 480V secondary 2000kVA transformers, 3000A 480V switchboard, interior lighting, and interior electrical low-voltage distribution equipment and branch circuit wiring. Scope within Load Center 2 also includes demolition of interior walls to allow for removal of electrical equipment, and repair of the existing utility cable vaults. In addition, scope includes demolition and replacement of two existing ship-to-shore power connection stations and associated under-pier 480V power and control wiring to the Load Center 2 480V switchgear and incidental related work.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents