Similar Projects
Cyl Tec Pump Station and WWTP Actuator Valve Replacement
Post-Bid
Tecumseh, MI

Booster Pump Station Repairs and Upgrades: Phase 1 / Phase 2
Post-Bid
Ann Arbor, MI

Eight Mile Road Pump Station Aboveground Diesel Storage Tank
Results
Less than $142,900 est. value
Waterford, MI

Fairview Sewage Pumping Station Improvements
Results
Detroit, MI

Busha Highway Emergency Storm Sewer Repair
Post-Bid
Marysville, MI 48040

Replacement of Water Pump at East Pump Station
Results
Flint, MI

Pump Station Improvements
Post-Bid
Less than $750,000 est. value
Brooklyn, MI

2019 Storm Sewer Improvement
Results
$189,969 est. value
Saint Clair Shores, MI

Right of Way Services
Post-Bid
MI

Northern Sanitary Pump Station Rehabilitation
Results
Port Huron, MI

Land Improvement – W and S – Sanitary and Storm Sewer System Maintenance Repairs
Post-Bid
Ann Arbor, MI

MTU 2019 Sewer Improvements
Results
Less than $100,000 est. value
Houghton, MI

Charter Township of West Bloomfield Lift Station 1 Site Improvements and Upgrade
Post-Bid
MI

Wastewater Capital Improvements
Results
Less than $100,000 est. value
Cassopolis, MI 49031

Elementary Gross Motor Room Overhead Lift System
Post-Bid
Traverse City, MI 49686

Last Updated 06/16/2020 08:26 AM
Project Title

Beal City Gravity Sewer, Dpw Building And Pump Station, And Force Main To Mt Pleasant -Contracts 1, 2, And 3

Physical Address View project details and contacts
City, State (County) Weidman, MI   (Isabella County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract 1 includes: approximately 3,240 lft of 8 inch sewer, 3,869 lft of 10 inch sewer, 2,779 lft of 6 inch sewer leads, 80 - 6 inch wyes, 25 sanitary manholes, misc storm sewer repair, HMA paving, and cleanup and restoration. Engineer's Estimate is $1,198,182.00. Contract 2 includes: a new 24'x30' DPW Building, a new pump station, valving, flow meter, and other appurtenances, HMA paving, and cleanup and restoration. Engineer's Estimate is $960,215.00. Contract 3 includes: approximately 57,235 of 6 inch force main including: 39,101 lft of open cut, 18,134 lft of directional bore, 175 feet of bore and jack, 12 cleanout/air release assemblies, 23 cleanout assemblies, HMA paving, and cleanup and restoration.

Details

Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents