Similar Projects
Hayes Elementary School Construction
New Construction
Conception
Ada, OK

Liberty Elementary School Remodel
Renovation, Addition
Conception
Ponca City, OK 74601

Elementary School Renovations
Renovation
Design
$26,010,000 est. value
Yukon, OK

New K-4th Grade Elementary School
New Construction
Design
$35,460,000 est. value
OK

Denison School Safe Building
Renovation
Bidding
$750,000 est. value
Idabel, OK 74745

Public School High School and Elementary School Renovation
Renovation
Bidding
$2,000,000 est. value
Burns Flat, OK

Twin Hills Schools Cafeteria Addition
Addition
Post-Bid
Okmulgee, OK 74447

Grant Foreman Renovation
Renovation
Post-Bid
Muskogee, OK 74401

Maud Public Schools Storm Shelter
Renovation
Results
Maud, OK 74854

Gymnasium at Wilson Elementary School
New Construction
Results
$3,500,000 est. value
Oklahoma City, OK 73103

Elementary Interior Improvements Project
Renovation
Construction
Wilson, OK 73463

St. Mary's Episcopal School
Addition
Construction
Edmond, OK 73034

South Elementary School
New Construction, Addition
Pending Verification
Tulsa, OK 74107

North Elementary School
Renovation
Pending Verification
Bixby, OK 74008

Union Elementary School Renovations
Renovation
Conception
Ponca City, OK 74601

Last Updated 07/01/2022 03:27 PM
Project Title

Washington School Replacement - 2021 Bond - Ada City School District

Physical Address View project details and contacts
City, State (County) Ada, OK   (Pontotoc County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Design Development, Construction Start Expected December 2022
Bids Due View project details and contacts
Estimated Value $37,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and new construction of an educational facility in Ada, Oklahoma. Design plans call for the construction of a educational facility. A more detailed scope is expected to be released on a future date. As of May 9, 2022, this project is in the design phase and the bond vote was passed by voters. An architect and construction manager have been selected for the project. Bidding is estimated to take place in September of 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Elementary School, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents