Similar Projects
Polyset Expansion
Addition, Infrastructure - 24,500 SF
Conception
$1,250,000 CJ est. value
Mechanicville, NY 12118

Starting Gate Farm & Winery
New Construction, Infrastructure - 15,000 SF
Conception
$5,900,000 CJ est. value
Ballston Spa, NY 12020

One-Four-Six Marketplace
New Construction, Infrastructure - 151,000 SF
Design
$140,000,000 CJ est. value
Halfmoon, NY 12118

West Avenue Mixed-Use
New Construction, Infrastructure - 4,039 SF
Design
$1,100,000 CJ est. value
Saratoga Springs, NY 12866

The Riverview Apartments
New Construction, Infrastructure - 66,100 SF
Bidding
$6,000,000 CJ est. value
Corinth, NY 12822

Village Green Park Court Improvements
Infrastructure
Bidding
$700,000 CJ est. value
Clifton Park, NY 12065

General Excavation Services
Infrastructure
Post-Bid
Ballston Spa, NY

Hill Street Drainage Betterment Contract No. 2
Infrastructure
Post-Bid
$200,000 CJ est. value
Mechanicville, NY 12118

Stillwater CSD 2021-2022 Capital Outlay - Elementary School Door and Library Reconstruction Project
Renovation
Results
$40,000 est. value
Stillwater, NY

First Floor Small Meeting Room and Lighting Replacement
Renovation
Results
Ballston, NY 12027

Tait Lane Reserve
New Construction, Infrastructure
Construction
$80,000,000 CJ est. value
Saratoga Springs, NY 12866

Summit At Halfmoon
New Construction, Infrastructure
Construction
$26,000,000 CJ est. value
Halfmoon, NY 12065

Chick-fil-A / Clifton Park
Demolition, New Construction, Infrastructure - 14,000 SF
Pending Verification
$1,000,000 CJ est. value
Clifton Park, NY 12065

Chloe's Place Development
New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Saratoga Springs, NY 12866

Luxury Apartments and Retail Development
Demolition, New Construction, Infrastructure
Conception
$37,000,000 CJ est. value
Clifton Park, NY 12065

Last Updated 04/17/2023 04:09 PM
Project Title

Addition & Renovations to the Fiber Mill For the Stillwater Public Library Stillwater - Contract No. 2 - General Construction Work

Physical Address View project details and contacts
City, State (County) Stillwater, NY 12170   (Saratoga County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Library - Public, Site Development
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,600,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 29, 2022, the project has been awarded. A timeline for construction has not been confirmed. Addition & Renovations to the Fiber Mill For the Stillwater Public Library Stillwater, New York *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Roof and Deck Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Library Equipment, Library Stack Systems, Audio-Visual Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Furniture, Institutional Furniture, Library Furniture, Book Shelves, Study Carrels, Index Card File Cabinets, Portable Audience Seating, Seat and Table Assemblies.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents