Similar Projects
University Boulevard Extension (Edminston Drive to Sudley Manor Drive)
Infrastructure
Bidding
$200,000 est. value
Manassas, VA 20108

Neabsco Mills Road Widening
Infrastructure
Bidding
$500,000 est. value
Woodbridge, VA 22191

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Blue Heron Landing Park
Renovation, Demolition, Infrastructure, Alteration
Post-Bid
Less than $775,000 est. value

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

2021 Latex Modified
Results
Less than $2,009,000 est. value
VA

I-95 and Route 123 (Exit 160) Interchange Improvements
Infrastructure
Post-Bid
VA

2021 Plant Mix
Results
Less than $2,848,000 est. value
VA

D/B - I-95 and Route 123 (Exit 160) Interchange Improvements
Infrastructure
Post-Bid
$200,000 est. value
Gainesville, VA

Interstate Auxiliary Lane Addition
Results
Less than $28,000,000 est. value
VA

2021 Plant Mix
Results
Less than $2,400,000 est. value

2021 Plant Mix
Results
Less than $4,990,000 est. value
VA

2021 Plant Mix
Results
Less than $4,610,000 est. value

2021 Plant Mix
Results
Less than $4,404,000 est. value
VA

13th High School Offsite Improvements
Results
Prince William, VA

Last Updated 06/20/2022 07:54 AM
Project Title

Fuller / Fuller Heights Road Improvements

Physical Address View project details and contacts
City, State (County) Triangle, VA 22172   (Prince William County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,919,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Generally, the project includes improvement located near the entrance to Quntico, Triangle, VA. The Fuller Road-Fuller Heights Road Improvement Project involves improvements to Fuller Road, the access road to the Quantico Marine Corps Base, a new left-turn lane along Joplin Road onto northbound Route 1, conversion of the existing left-turn lane to a thru lane and the re-aligning of Fuller Heights Road Intersection to maximize the crossover spacing with Route 1. The new relocated intersection will provide north and southbound access via a roundabout located at the intersection of Fuller Heights Road and Old Triangle Road. Major project features include: 1) roadway widening and reconstruction, 2) storm drainage improvements, 3) precast arch structure, 4) a roundabout, and 5) a new traffic signal and a signal modification. The Work includes, but is not limited to, installation of erosion control devices, clearing and grubbing, grading, excavation, supplying and installing storm sewers pipes, waterline, traffic signals, signage, pavement markings, lighting, drainage structures, ditches, curb and gutter, concrete sidewalk, asphalt paving, mill and overlaying, and all measures required for the maintenance of traffic during construction. All Work shall be performed in accordance with the approved project plans and bid documents. The completed project shall meet all of the requirements for final acceptance by the Virginia Department of Transportation and Prince William County Department of Transportation

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents