Similar Projects
Sewer Grinder Pump Systems
Term Contract
Bidding
$300,000 est. value
Essex, MA

Sewer System Rehabilitation and Improvements
Post-Bid
Less than $3,400,000 est. value
Lawrence, MA

Storm Drains and Catch Basin Cleaning
Post-Bid
Beverly, MA

2019 Wastewater Collection System Cleaning and CCTV Inspection
Results
Less than $300,000 est. value
Danvers, MA

Wastewater Facilities Improvements Comprehensive Sewer System Rehabilitation - CO-01-1
Results
Less than $575,000 est. value
Danvers, MA

West Street Force Main Replacement
Post-Bid
Less than $94,000 est. value
Danvers, MA

FY20 thru FY22 On-Call Utility Repair Emergency Services Contract
Term Contract
Results
Manchester-By-The-Se, MA

Purchase of Water and Sewer Supplies for Public Works Department
Post-Bid
Less than $90,000 est. value
Salem, MA

Sewer Pipeline Cleaning and TV Inspections for Areas on Route # 1
Results
Less than $45,000 est. value
Saugus, MA

Various Sewer Man Hole, Drain Man Hole, and Catch Basin Small Repair Projects
Post-Bid
Saugus, MA 01906

Annual and Emergency Sewer Cleaning and CCTV Inspections
Results
Less than $45,000 est. value
Saugus, MA

On Call Drain Cleaning Services
Post-Bid
Less than $25,000 est. value
Methuen, MA 01844

Phase 1 West Lynn Sewer Separation Construction Project
Results
Less than $15,500,000 est. value
Lynn, MA

On-call Pipe Lining and Manhole Rehabilitation at Various Locations as Needed
Post-Bid
Less than $80,000 est. value
Ipswich, MA

Catch Basin Cleaning
Results
Less than $30,000 est. value
Methuen, MA 01844

Last Updated 12/16/2020 11:08 AM
Project Title

CSO Dry Weather Connector Pipe Improvements

Physical Address View project details and contacts
City, State (County) Haverhill, MA   (Essex County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of CSO regulator improvements at four CSO regulator areas in the City of Haverhill, MA including modifications of existing CSO regulators, installing new manholes and sewer pipes, rehabilitation of existing sewer pipes, and site restoration including paving. The time for substantial completion of this Contract is 210 calendar days. The time for final completion of this Contract is 240 days.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents