Similar Projects
Miami Grill
Renovation - 2,000 SF
Conception
Orlando, FL

Apopka City Center - Master Plan
New Construction - 200,000 SF
Conception
$100,000,000 est. value
Apopka, FL 32703

Solis Orlando Resort, Capella Suites Hotel and Retail Complex
New Construction - 1,600,000 SF
Design
$500,000,000 est. value
Orlando, FL 32819

Skyplex Rollercoaster Complex
New Construction, Demolition
Design
Orlando, FL 32819

Dairy Queen Grill & Chill
New Construction - 3,288 SF
Bidding by Invitation
$1,100,000 est. value
Orlando, FL 32829

Walk-On's Bistreaux & Bar
New Construction - 8,000 SF
Sub-Bidding
Orlando, FL 32821

JW Marriott Concession/Restroom Project
New Construction - 27,645 SF
Sub-Bidding
Orlando, FL 32821

Hilton Garden Inn at Millenia
New Construction - 90,719 SF
Post-Bid
$12,000,000 est. value
Orlando, FL 32839

Lime Fresh Mexican Grill
Renovation - 2,804 SF
Post-Bid
Orlando, FL 32832

Design/Build Services Hyatt Lobby Renovation OIA
Renovation
Results
Orlando, FL 32800

Church Street Plaza Tower
New Construction - 601,225 SF
Construction
$81,000,000 est. value
Orlando, FL 32821

Springhill Suites Lake Nona
New Construction - 93,000 SF
Construction
Orlando, FL 32824

Regal Eagle Smokehouse - Craft Drafts & Barbecue
Renovation
Pending Verification
Lake Buena Vista, FL 32830

Mooyah Burgers, Fries & Shakes
Renovation - 2,500 SF
Pending Verification
Orlando, FL

Green District Master Plan
New Construction - 1,500,000 SF
Conception
$300,000,000 est. value
Orlando, FL 32801

Reported 10/24/2019 12:24 PM
Project Title

Epic Universe Theme Park Resort - Master Plan

Physical Address View project details and contacts
City, State (County) Orlando, FL   (Orange County)
Category(s) Commercial, Entertainment/Recreation
Sub-Category(s) Food/Beverage Service, Hotel/Motel, Theme Park
Contracting Method Bids by Invitation.
Project Status Master Planning
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Total sq ft for project not available at this time.
Details Theme Park, New Construction, Hotel/Motel, New Construction, Food/Beverage Service, New Construction, 800 Acres.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting, Special Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Refrigerated Display Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Countertops, Furnishings and Accessories, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Hospitality Furniture, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 14 - Conveying Equipment, Elevators, Elevator Equipment and Controls.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Facility Lightning Protection, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents