Similar Projects
North Country Commons Redevelopment
Renovation - 7,500 SF
Conception
Clifton Park, NY

Curlin Cafe - Refurbishment
Renovation
Conception
Saratoga Springs, NY 12866

La Quinta Inn / WallKill
New Construction
Design
$2,000,000 est. value
Wallkill, NY

One-Four-Six Marketplace
New Construction - 151,000 SF
Design
$140,000,000 est. value
Halfmoon, NY

Taco Bell #20863
Renovation - 2,288 SF
Bidding
$350,000 est. value
Patchogue, NY 11772

Just Salad #65 / Westbury
Renovation - 2,583 SF
Bidding
$300,000 est. value
Westbury, NY 11590

Taco Bell #5083 / Farmingville
Renovation - 2,170 SF
Sub-Bidding
$350,000 est. value
Farmingville, NY 11738

Vassar Inn & Institute
New Construction - 48,142 SF
Post-Bid
$34,000,000 est. value
Poughkeepsie, NY 12603

Purchase and Rehabilitation of a City-Owned Property - 120 Grand Street
Post-Bid
Newburgh, NY 12550

City of Plattsburgh - Dock Street Development - Developer Services
Results
Plattsburgh, NY 12901

Tully CSD Capital Project 2022 - Phase 2
New Construction, Renovation
Results
Tully, NY 13159

Holiday Inn Express
New Construction
Construction
New Rochelle, NY 10801

Ellicott Station Redevelopment
New Construction, Renovation
Construction
$25,000,000 est. value
Batavia, NY 14020

Concern for Independent Living Supported Housing
New Construction - 6,188 SF
Pending Verification
Southampton, NY 11968

Pace University Academic Center & Dormitory
New Construction - 213,084 SF
Pending Verification
$10,000,000 CJ est. value
New York, NY

Reported 07/13/2022 10:53 AM
Project Title

McDonald's Renovation / Penfield

Physical Address View project details and contacts
City, State (County) Webster, NY 14580   (Monroe County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service
Contracting Method Bids by Invitation.
Project Status Obtained from a News Source, Construction Start Expected October 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and addition to a restaurant in Webster, New York. Design plans call for the addition of a restaurant; and for site work for a restaurant. Plans call for the construction of an additional drive-thru menu board adjacent to the existing drive-thru, a small building addition and associated site improvements. As of July 12, 2022, this project is seeking approvals with the Penfield Planning Board. Although there is not a firm timeline, construction could begin in fourth quarter 2022.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Food/Beverage Service, Addition.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents