Similar Projects
Last Updated | 04/19/2022 01:13 PM |
Project Title | Remove the Existing Bridge and Construct a New 3 Span Precast, Prestressed, Concrete Deck Beam Bridge With Improvements to the Approach Roadways |
Physical Address | View project details and contacts |
City, State (County) | Sparta, IL (Randolph County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $564,117 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Remove The Existing Bridge And Construct a New 3 Span Precast, Prestressed, Concrete Deck Beam Bridge With Improvements To The Approach Roadways. 1. Earth Excavation - 179 Cu Yd 2. Channel Excavation 887 Cu Yd 3. Furnished Excavation - 607 Cu Yd 4. Porous Gran Embank - 86 Ton 5. Seeding Cl 2 - 0.5 Acre 6. Nitrogen Fert Nutr - 45 Pound 7. Phosphorus Fert Nutr - 45 Pound 8. Potassium Fert Nutr - 45 Pound 9. Agr Ground Limestone - 1 Ton 10. Mulch Method 2 - 0.5 Acre 11. Agg Base Cse a - 905 Ton 12. Removal Of Existing Structures - 1 Each 13. Structure Excavation - 24 Cu Yd 14. Conc Struct - 40 Cu Yd 15. Concrete Encasement - 52.5 Cu Yd 16. p p Conc Dk Bm 21 Dp - 3,024 Sq Ft 17. Reinf Bars, Epoxy Ctd - 5,710 Pound 18. Steel Railing Ty s1 - 256 Foot 19. Pur Stl Pile Hp12x553 180 Foot 20. Fur Stl Pile Hp 14x73 - 200 Foot 21. Drill & Set Piles Ir - 944 Cu Ft 22. Name Plates - 1 Each 23. Terminal Marker-Da - 4 Each 24. Stone Dump Rip c a4 Sp - 436 Ton |
||||||||||||||||||||
Details | Bridge, New Construction.
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |