Similar Projects
Crystal Lake Park Roadway And Parking Improvements
Infrastructure
Bidding
Urbana, IL 61801

Crystal Lake Park Roadway And Parking Improvements
Infrastructure
Bidding
Urbana, IL 61801

2021-2022 Miscellaneous Repair Contract
Term Contract
Post-Bid
Urbana, IL

Central Division - Asphalt Paving Maintenance
Post-Bid

Sidewalk Removal and Construction of New Sidewalks and a Multi-Use Path
Results
Rantoul, IL 61866

St. Mary's Road Neil to Oak Reconstruction
Results
Champaign, IL

Indian Grocery Store
Renovation, Alteration - 5,000 SF
Construction
Champaign, IL 61820

Congress Avenue & Sheldon Street Resurfacing
Infrastructure
Bidding
Rantoul, IL

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Resurfcing Maplewood Drive From the North City Limits of Rantoul to Veteran's Parkway in Rantoul
Results
Rantoul, IL

Curbanas/Parklets Decking System
Post-Bid
Urbana, IL

Ramp Construction
New Construction
Results
Less than $2,421,144 est. value

South Mahomet Road Utility Extensions
Post-Bid
Mahomet, IL 61853

2021 General HMA Paving
Results
Less than $241,920 est. value
Mahomet, IL

2021 Infrastructure Maintenance
Post-Bid
Champaign, IL

Last Updated 02/04/2022 01:26 PM
Project Title

Bradley Avenue Improvements

Physical Address View project details and contacts
City, State (County) Champaign, IL 61822   (Champaign County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes removing a portion of Bradley Avenue from the intersection with Staley Road to Station 101+00.00 and replacing it with new HMA pavment, shoulders and curb and gutter, and then milling and resurfacing the remainder of Bradley Avenue to just west of Bluegrass Lane, with some patching, and adding new HMA shoulders. With this project, the Bluegrass Lane will be constructed with new PCC pavement from the edge of Bradley Avenue to the back of the radius returns. New ADA compliant curb ramps will be added at the intersections of Bradley Avenue with Staley Road and Bluegrass Lane, and a berm will be graded for a future sidewalk along the south side of Bradley Avenue from Station 104+08.88 to Station 114+58.68.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents