Similar Projects
Caribou Crossing Townhomes
New Construction, Infrastructure
Design
$11,000,000 CJ est. value
Idaho Falls, ID 83401

Repair Walkway, Ramps, Railings, UP/IF
Infrastructure
Design
$205,000 CJ est. value
Idaho Falls, ID 83402

Wastewater Treatment Plant Dewatering Project
New Construction, Renovation, Infrastructure
Bidding
$9,500,000 CJ est. value
Idaho Falls, ID 83402

North Highland Park Concrete Improvements 2023
Infrastructure
Bidding
$400,000 CJ est. value
Idaho Falls, ID 83402

Pipe
Alteration
Post-Bid
Idaho Falls, ID

2022 Waterline Surface Repair
Infrastructure
Post-Bid
Idaho Falls, ID

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

SH-31, Overlay and Guardrail Upgrade
Infrastructure
Results
$10,000,000 to $15,000,000 est. value

Eagle Ridge Residentail Development - Division 4
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Idaho Falls, ID 83402

Casseopeia Town Homes
New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Idaho Falls, ID 83402

Taylorview Townhomes
New Construction, Infrastructure
Design
$10,500,000 CJ est. value
Idaho Falls, ID 83402

Constructing Intersection Improvements with Signal Improvements, Additional Left-Turn Lane and a Dedicated Right-Turn Lane
Infrastructure
Post-Bid
ID

Pedestrian Path Connection Plan
Infrastructure
Results
$250,000 to $500,000 est. value
ID

Future Tech Building
New Construction, Infrastructure - 94,000 SF
Design
$32,830,000 CJ est. value
Idaho Falls, ID 83404

Sewer Line Rehabilitation 2022
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Idaho Falls, ID 83402

Last Updated 12/07/2022 07:27 PM
Project Title

Lincoln Dr and John Adams Pkwy Water Line Improvements 2023

Physical Address View project details and contacts
City, State (County) Idaho Falls, ID 83401   (Bonneville County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Expected, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: Lincoln Dr & John Adams Pkwy between Linden Dr This project shall consist of the Contractor furnishing all the tools, labor, equipment, and material necessary to excavate approximately 2200 CY of material, remove and replace approximately 900 LF of curb & gutter and 250 SY of sidewalk, install approximately 3100 LF of 8" water line, 900 CY of aggregate base and subbase, 750 tons of plant mix pavement, and any additional items specifically defined in the Bid Documents.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents