Similar Projects
Last Updated | 11/02/2020 12:23 PM |
Project Title | Baraga to Arnheim Rail Trail – Phase 3 Trestle Deck Repair Over Little Carp River |
Physical Address | View project details and contacts |
City, State (County) | MI (Baraga County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project consists of removal of the existing railroad ties and installation of a new steel frame bridge deck system with an oak wearing surface on the approximate 221-foot-long railroad trestle over the Little Carp River in Baraga Township. Work also includes the installation of steel railings and wood approach safety railings, concrete patching on the north abutment, riprap installation, clearing, permanent sheet piling installation, trail surfacing, restoration and associated SESC measures. |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |