Similar Projects
Y--P588 Fuller Road Improvements, MCB, Quantico, VA
Results
$5,000,000 to $15,000,000 est. value
Quantico, VA

2019 Slurry Seal
Results
Less than $990,000 est. value

2019 Surface Treatment
Results
Less than $458,000 est. value

2019 Latex Modified
Results
Less than $2,191,000 est. value

On-Call Interstate Asphalt Concrete Patching
Results
Less than $847,000 est. value

High Friction Surface Treatment Paving
Results
Less than $925,000 est. value

2019 Plant Mix
Results
Less than $7,250,000 est. value
VA

Pavement Marking Eradication, Grooving
Term Contract
Results

2019 Plant Mix
Results
Less than $5,201,000 est. value
VA

2019 Plant Mix
Results
VA

Roadway Departure Crash Mitigation
Results
Less than $439,000 est. value
VA

Asphalt Paving Goods and Services
Term Contract
Results
Woodbridge, VA

Prince William Parkway Interchange at Realigned Balls Ford Road
Results
$145,000,000 est. value
Prince William, VA 22192

Occoquan Bay National Wildlife Refuge - FW-OCBA T302(1)
Results
$500,000 to $1,000,000 est. value
Prince William, VA

2020 Slurry Seal
Results
Less than $1,207,000 est. value

Last Updated 06/11/2019 11:58 AM
Project Title

Inn Street Improvement Project

Physical Address View project details and contacts
City, State (County) Prince William, VA 22192   (Prince William County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description Generally, the Project includes constructing an urban local road (Inn Street Connection from Route 1 southbound lanes to existing Inn Street, north of Joplin Road /Route 1 intersection south of Anderson Road in Prince William County, approximately 650 linear feet of roadway will be provided with the connection. The project includes construction of a box culvert crossing of Little Creek near the connection to existing Inn Street.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents