Similar Projects
FY 2019 Southeast WWTP Improvements
Post-Bid
Douglas, GA

Westside WWTF Improvements
Post-Bid
Eatonton, GA

Flat Creek WRF Sludge Storage Addition
Results
Less than $1,473,750 est. value
Gainesville, GA 30501

RM Clayton WRC Digester Improvements and Rehabilitation Phase One
Results
Atlanta, GA 30318

Mineral Springs Wastewater Treatment Plant Expansion to 0.95 MGD
Construction
Less than $6,000,000 est. value
Newnan, GA

WWTP Improvements and Glynn Addy Pump Station Rehabilitation
Construction
$3,500,000 est. value
Stockbridge, GA

Eastside WWTF Improvements
Post-Bid
Eatonton, GA

2018 Wastewater System Capital Improvements
Results
$2,500,000 est. value
Cedartown, GA

Wastewater Treatment Plant Maintenance and Upgrades
Post-Bid
Less than $650,000 est. value
Darien, GA

A. Scott Emmons WRF at the Little River
Term Contract
Results
Less than $140,000 est. value
Covington, GA

Big Flat Creek WRF 3.33 MGD Upgrade
Post-Bid
Loganville, GA 30052

Wastewater Treatment Facility Improvements
Results
$1,200,000 est. value
Hiawassee, GA 30546

Big Flat Creek WRF - Highway 81 Entrance Security Improvements
Post-Bid
Loganville, GA 30052

UV Disinfection System Replacement
Results
Less than $164,927 est. value
Statesboro, GA 30458

Belt Press Replacement Bear Creek WPCP
Post-Bid
Hampton, GA 30228

Reported 12/14/2018 12:00 AM
Project Title

Construction of 2017 Newington CDBG

Physical Address View project details and contacts
City, State (County) Newington, GA   (Screven County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description The work shall consist of furnishing all products and equipment and performing all labor necessary to perform the following: Installation of 33 Bioshells in the Town's existing wastewater treatment pond. Also includes the installation of two blowers, two concrete tanks, a chlorination system, a dechlorination system, piping, and associated electrical wiring and equipment.
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents