Similar Projects
Harmony Grove Rd Br PM
Renovation, Alteration
Conception
$3,375,680 est. value
Dover, PA 17315

Chestnut Street Project
Infrastructure
Conception
$395,500 CJ est. value
Dillsburg, PA 17019

North York Interstate 83 Widening
Infrastructure
Design
$103,489,753 CJ est. value
East York, PA 17402

Colonial Road Bridge
Infrastructure, Renovation
Design
$797,000 CJ est. value
York, PA 17401

Capital City Executive Airport Rehabilitate Taxiways B, C, D, J, L and Taxiway A East Run Up, Phase II
Infrastructure
Bidding
$548,042 CJ est. value
New Cumberland, PA 17070

Capital City Executive Airport Rehabilitate Taxiways B, C, D, J, L and Taxiway A East Run Up, Phase II
Infrastructure
Bidding
$548,042 CJ est. value
New Cumberland, PA 17070

Replacement of Asbestos Cement and PVC Waterlines
Post-Bid
Shrewsbury, PA 17361

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
$500,000 CJ est. value
Jacksonville, NC 28547

2020 Water Main Replacement Project
Results
Dover, PA 17315

Third Street Water Main Replacement
Results
Hanover, PA

Apartments at Memory Lane
New Construction, Infrastructure
Pending Verification
$17,000,000 CJ est. value
East York, PA 17402

Pleasant Acres Annex Apartments
New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
East York, PA 17402

New Intermediate School - Eastern York School District
New Construction, Infrastructure - 116,000 SF
Design
$33,442,619 CJ est. value
Yorkana, PA 17406

New Freedom 2022 - Rail Trail Crosswalk Improvement Project
Infrastructure
Bidding
$250,000 CJ est. value
New Freedom, PA 17349

Tapping Sleeves, Tapping Valves, and Gate Valves
Infrastructure
Post-Bid
Hanover, PA

Last Updated 08/01/2022 03:09 PM
Project Title

Haviland Road Sewer Extension Project

Physical Address View project details and contacts
City, State (County) Shiloh, PA 17408   (York County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $478,461 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Work to be performed for the Haviland Road Sewer Extension Project involves obtaining all materials and completing all work related to the construction of sanitary sewer extensions beneath Haviland Road and an unnamed alley from an existing sewer beneath Brougher Lane as detailed in the contract documents. The project includes, but is not limited to, earth work, rock removal, utility relocation, manhole installation, sewer pipe installation, and site restoration. Maps and plans have been included on the Penn BID website defining the project area. The construction easements required for this project will be secured by the Township prior to the notice to proceed. This construction project is financed by a grant from the Commonwealth of Pennsylvania, Commonwealth Financing Authority (CFA) and must comply with PA Small Water and Sewer Program guidelines. Work must be performed to ensure that non-discrimination/sexual harassment provision of the contract documents and the CFA are met. The work shall also conform to the requirements of the Pennsylvania Prevailing Wage Act. West Manchester Township, in accordance with Title VI of the U.S. Civil Rights Act of 1964 and Parts 21 and 23 of 49 C.F.R., notifies all respondents that it will affirmatively ensure that MBE/WBE will be afforded full opportunity to submit proposals in response to this invitation and that no person will be discriminated against on the grounds of race, color, sex, or national origin in consideration for an award. The time for completion of the work of this contract is 120 days from the issuance of the notice to proceed. The Owner hereby reserves the right to reject any and/or all proposals submitted. The Owner also reserves the right to waive any defects, errors, omissions, irregularities, or informalities in the proposals received. Questions submitted after 5:00 PM on June 8, 2022, will not be answered. Contract Time: 100 calendar days

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents