Similar Projects
Hot-Mix Asphalt Surface Course
Infrastructure
Bidding
Crystal Lake, IL

Reclamite Asphalt Rejuvenator and CRF Restorative Seal
Post-Bid
Johnsburg, IL

Central Division - Asphalt Paving Maintenance
Post-Bid

Harmony Road Bridge Repairs
Renovation
Results
$93,995 est. value
Marengo, IL 60152

Union Pacific/Cary Maintenance Garage Site Preparation Improvements
Renovation
Results
Cary, IL 60013

Amazon Distribution Center and Office Warehouse
New Construction - 673,186 SF
Construction
$100,000,000 est. value
Huntley, IL 60142

2021 HMA Materials Only
Post-Bid
McHenry, IL

(2.578-Mile) Improvement on Il-120 (Belvidere Road) From Mchenry Co. Line to East of II-60 Consist of Sealing Cracks and Joints in the Existing Concrete Pavement, Restriping Pavement Marking
Results

2021 Asphalt Purchase
Post-Bid
IL

Ramp Construction
New Construction
Results
Less than $2,421,144 est. value

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

2021 Road Resurfacing Program
Results
Cary, IL

Hebron Road Pavement Improvements
Infrastructure
Post-Bid
Hebron, IL

Wonder Woods Subdivision And Wonder Woods Drive Road Improvements
Results
McHenry, IL

School Road Resurfacing
Infrastructure
Post-Bid
Ringwood, IL

Last Updated 09/18/2021 03:03 AM
Project Title

(16.3-Mile) Pavement Surface Patching (2-in Mill and Fill / Intermittent Resurfacing) Improvement

Physical Address View project details and contacts
City, State (County) Hebron, Richmond, IL   (McHenry County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

(16.3-Mile) Pavement surface patching (2-in mill and fill / intermittent resurfacing) improvement. Includes affected PMKs restoration. Location: IL 173 (Maple Ave) from Alden Rd to Lake Co Line in the Villages Alden Hebron and Richmond in McHenry County. 40600290poundbituminous Materials (Tack Coat)Base Items9,404.000 40600400tonmixture For Cracks, Joints, And Flangewaysbase Items50.000 40604062tonhot-Mix Asphalt Surface Course, Il-9.5, Mix "d", n70base Items1,833.000 44000157sq Ydhot-Mix Asphalt Surface Removal, 2"Base Items16,362.000 67000400cal Moengineer's Field Office, Type Abase Items12.000 67100100l Summobilizationbase Items1.000 70100600l Sumtraffic Control And Protection, Standard 701336base Items1.000 70102620l Sumtraffic Control And Protection, Standard 701501base Items1.000 70102622l Sumtraffic Control And Protection, Standard 701502base Items1.000 70102635l Sumtraffic Control And Protection, Standard 701701base Items1.000 70300520footpavement Marking Tape, Type Iii 4"Base Items1,360.000 78000200footthermoplastic Pavement Marking - Line 4"Base Items19,072.000 78100100eachraised Reflective Pavement Markerbase Items165.000 78300200eachraised Reflective Pavement Marker Removalbase Items165.000 x0326898footcenter Line - Rumble Strip - 16"Base Items2,640.000 x4405020footlongitudinal Partial Depth Removal 2"Base Items13,600.000 x4420900tonlongitudinal Partial Depth Patchingbase Items508.000 x7030005sq Fttemporary Pavement Marking Removalbase Items454.000 z0030850sq Fttemporary Information Signingbase Items104.000 z0076604hourtrainees Training Program Graduatebase Items500.000$15.00

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents