Similar Projects
14th Street - Connector to Ferguson Park (Crestview District) - City of Temple
Infrastructure
Conception
$1,800,000 est. value
Temple, TX 76501

Houston Avenue Trail - City of Temple
Infrastructure
Conception
Less than $600,000 est. value
Temple, TX 76501

Remedial Repair Attoyac Bayou Site 21
Infrastructure
Design
$250,000 CJ est. value
Nacogdoches, TX 75961

BancorpSouth - Adams Avenue Branch / Temple
Addition, Demolition, Infrastructure, Renovation - 6,264 SF
Design
$1,750,000 CJ est. value
Temple, TX 76502

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ Design - Design Services for the Emergency Operation Complex and Fire Station No. 4 - 220038 - City of Killeen
New Construction, Infrastructure
Post-Bid
$5,700,000 CJ est. value
Killeen, TX 76541

FM 2115 - Rehabilitate and Widen Shoulders
Infrastructure
Results
$6,908,139 est. value
TX

Construction of the Avenue South Water Improvements
Infrastructure
Results
Belton, TX 76513

Starbucks / Killeen
Infrastructure, Renovation - 2,390 SF
Construction
$750,000 CJ est. value
Killeen, TX 76549

Starbucks / Killeen
Infrastructure, Renovation - 2,390 SF
Construction
$750,000 CJ est. value
Killeen, TX 76549

Apache Drive Sidewalk Improvements - City of Temple
Infrastructure
Pending Verification
$413,167 CJ est. value
Temple, TX 76504

Apache Drive Sidewalk Improvements - City of Temple
Infrastructure
Pending Verification
$413,167 CJ est. value
Temple, TX 76504

Area at Ave E and Ave H (Ferguson Park District) - City of Temple
Infrastructure
Conception
$1,300,000 CJ est. value
Temple, TX 76501

Espresso Project - New Shell Building
New Construction, Infrastructure - 7,060 SF
Design
$882,500 CJ est. value
Harker Heights, TX 76548

Slurry Seal Services
Term Contract
Post-Bid
Killeen, TX

Last Updated 05/30/2023 07:33 PM
Project Title

College & 13th Avenue Improvements & Annual Street Maintenance

Physical Address View project details and contacts
City, State (County) Belton, TX 76513   (Bell County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $2,853,643 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

For College and 13th Avenue, this project includes, but is not limited to, approximately 1,500 linear feet of curb and gutter, 5,500 SY of crushed limestone base material, 4,100 square yards of asphalt, driveway replacement, concrete valley gutter construction, SWPPP installations, and traffic control. For Annual Street Maintenance, this project includes, but is not limited to, approximately 105,255 square yards of 2" asphalt mill and overlay, 800 linear feet of curb and gutter replacement, concrete collars for manholes and valve boxes, miscellaneous striping, SWPPP installations, and traffic control. Bids must be submitted on the Bid Form provided and must be accompanied by a cashier's check, certified check or acceptable bidder's bond payable without recourse to the City of Belton, Texas in an amount not less than five (5) percent of the bid submitted as a guarantee that the bidder will enter into a contract and execute a Performance Bond and a Payment Bond within ten (10) days after the notification of the award of the contract. The City of Belton reserves the right to accept or reject any and all bids, as the best interest of the City may require, and to waive any informality in bids received.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents