Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Bituminous Plant Mix Asphalt
Term Contract
Post-Bid

Grading, Drainage, Paving, And Structures
Infrastructure
Results
NC

Milling and Resurfacing
Infrastructure
Results

Statewide Intelligent Transportation System
Infrastructure
Post-Bid

Grading, Drainage, Paving, Reatining Walls, and Structure
New Construction, Infrastructure
Results
NC

2019 CWSRF Sanitary Sewer Project Contract No. 1 - Sanitary Sewer Replacement
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Bailey, NC 27807

Resurfacing
Infrastructure
Results
NC

Manhole Replacement on Abbey Road
Infrastructure
Post-Bid
$300,000 CJ est. value
Rocky Mount, NC 27804

On Call Small Construction in District 2
Infrastructure
Results

2019 Clean Water State Revolving Fund Wastewater System Improvements
Renovation, Infrastructure
Post-Bid
$2,200,000 CJ est. value
Sharpsburg, NC 27803

On Call Small Construction Work K Located at Various Locations Within Division 4
Term Contract
Results

Underground Boring at Lawrence Circle
Infrastructure
Post-Bid
$110,000 CJ est. value
Rocky Mount, NC 27804

Grading, Drainage and Paving at NC 43 and US 64 Bypass Interchange
Infrastructure
Results
NC

Thin Lift Asphalt Pavement Preservation
Infrastructure
Results
$2,000,000 est. value
Nashville, NC

Last Updated 08/30/2022 03:31 PM
Project Title

Patching Repairs for Town Maintained Streets

Physical Address View project details and contacts
City, State (County) Sharpsburg, NC 27803   (Nash County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope The Town of Sharpsburg Public Works department, responds to various leaks and with the repair of the leaks, streets require repair. The scope is to cover the require repair work to provide asphalt back over the existing area where the water line was repaired. It is anticipated that all work will be awarded to one contractor. Project Number Road Name Work Needed 1 Hill Top Road 2" of asphalt for a 10 x 10 patch 2 Dale Drive 2" of asphalt for an 8 x 20 patch 3 Dale Drive 2" of asphalt for an 8 x 20 patch All questions concerning the bid should be directed to publicinformation@sharpsburgnc.com. Questions and clarifications will be received up and until August 15, 2022, 5:00pm EST. Liquidated Damages The parties agree that calculation of actual damages resulting from failure to meet the following performance standards is extremely difficult, if not impossible, to calculate accurately, and the parties also agree that the compensation identified for such failures are a reasonable estimate of damages resulting from a failure to meet the performance standard described. Therefore, the parties agree that the Vendor shall be subject to amounts due as liquidated damages but not as a penalty, for each such failure, as follows: For each day in excess of the deadline the Contractor shall pay the Town the sum of $75.00 per day for liquidated damages. Construction Debris All debris should be contained in an appropriate construction container and disposed of in the appropriate landfill as required and or needed. Mandatory Pre-Bid There is no mandatory pre-bid required, however we highly encourage required site visits in order to appropriately quote work.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents