Similar Projects
Site work for a golf course in Laurel, Maryland.
Infrastructure
Conception
$831,000 CJ est. value
Longview, WA 98632

46th Avenue Construction - City of Longview
Demolition, New Construction, Infrastructure
Conception
$3,650,000 CJ est. value
Longview, WA 98632

SR 504/N Fork Toutle River Kid Valley Bridge - Repair Girders
Infrastructure, Renovation
Design
$2,361,000 CJ est. value
Toutle, WA 98649

I-5/SB Toutle River Bridge - Painting
Renovation, Infrastructure
Design
$4,085,000 CJ est. value
Castle Rock, WA 98611

Ostrander Road Culvert Replacement Project
Infrastructure
Bidding
$1,000,000 CJ est. value
Kelso, WA 98626

Fishers Lane Water Treatment Plant Demo
Demolition, Infrastructure
Bidding
$400,000 CJ est. value
Kelso, WA 98626

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

West Scott Avenue and Davidson Avenue BNSF Water Main Crossings
Infrastructure
Results
$850,000 est. value
Woodland, WA 98674

Lower Columbia College - Water Line Replacement - Vancouver
Infrastructure
Results
$72,000 CJ est. value
Longview, WA 98632

Waterfront Condominiums
New Construction, Infrastructure
Pending Verification
$15,500,000 CJ est. value
Woodland, WA 98674

Beech Street to Baltimore Water Main Replacements - City of Longview
Infrastructure
Conception
$350,000 est. value
Longview, WA

Beacon Hill Reservoir
Infrastructure
Design
$300,000 CJ est. value
Kelso, WA 98626

SWRA: Fuel System Equipment Procurement
Infrastructure
Bidding
$580,000 CJ est. value
Kelso, WA 98626

Kelso High School Practice Field Improvements
Infrastructure
Post-Bid
$320,000 CJ est. value
Kelso, WA 98626

Last Updated 04/24/2023 09:40 AM
Project Title

West Scott Avenue Asbestos Cement Waterline Replacement

Physical Address View project details and contacts
City, State (County) Woodland, WA 98674   (Cowlitz County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $344,806 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For furnishing the necessary labor, materials, equipment, tools, and guarantees thereof to construct the Guild Road and West Scott Avenue Improvements (Schurman Way to Pacific Avenue). The Contract provides for the installation of approximately 1,300 feet of 12-inch C-900 PVC water main on West Scott Avenue from Down River Drive to Pacific Avenue. Improvements include, but are not specifically limited to, abandonment of existing asbestos cement water main, installation of valves and fire hydrants, reconnection of existing water services, connections to existing system, traffic control and other miscellaneous items as further shown, described, and indicated in the Contract Documents. The Work shall be substantially complete within 30 working days after the commencement date stated in the Notice to Proceed. All bidding and construction is to be performed in compliance with the Contract Provisions and Contract Plans for this project and any addenda issued thereto that are on file at the office of the City Clerk, City Hall, Woodland, Washington. The Proposals will be publicly opened and read aloud shortly after the time and date stated above. Proposals are to be submitted only on the form provided with the Bid Documents. Bidders are encouraged to register to receive automatic email notification of future addenda and to be placed on the Bidders List. For assistance, please call (206) 284 0860. Contract questions shall be directed only to the office of the Project Engineer. Financing of the Project has been provided by City of Woodland, Washington. The City of Woodland expressly reserves the right to reject any or all Proposals and to waive minor irregularities or informalities in any Proposal. Contract questions shall be directed only to the office of the Project Engineer.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents