Similar Projects
Silicon Campus North FAB
New Construction - 128,816 SF
Design
$10,000,000 CJ est. value
Durham, NC 27703

Audentes Manufacturing Facility
Renovation - 135,000 SF
Design
$109,400,000 est. value
Sanford, NC

Cummins AFT Expansion – Phase 1A
Addition - 31,000 SF
Post-Bid
Whitakers, NC 27981

Cook Out Meat Processing Center
Renovation - 9,117 SF
Post-Bid
Thomasville, NC 27360

Ashley Furniture Plant 1 Phase 2 Addition
New Construction, Addition - 532,166 SF
Construction
$20,000,000 est. value
Advance, NC 27006

Greenway Waste Materials Recycling Facility
New Construction - 30,000 SF
Construction
$1,910,700 est. value
Huntersville, NC

Pratt & Whitney Manufacturing Facility
New Construction - 1,000,000 SF
Pending Verification
$650,000,000 est. value
Asheville, NC 28800

American Fuji Seal Inc
New Construction - 260,000 SF
Design
$52,000,000 est. value
Hickory, NC 28601

Schmalz Manufacturing Expansion
Addition - 53,031 SF
Post-Bid
Raleigh, NC

Seqirus Expansion
New Construction - 90,000 SF
Construction
$50,003,970 est. value
Holly Springs, NC

Zink Zero
New Construction, Renovation - 30,000 SF
Post-Bid
Whitsett, NC 27377

Ethan Allen Furniture Plant #2
Addition - 80,000 SF
Construction
Maiden, NC 28650

TE Connectivity Core Manufacturing Upfit
Renovation - 5,400 SF
Construction
$434,000 est. value
Winston-Salem, NC 27101

Titan Project Phase 2
Renovation - 17,000 SF
Construction
Greensboro, NC 27409

Zero Waste Recycling Addition
New Construction - 74,640 SF
Construction
$1,376,100 est. value
Charlotte, NC 28208

Last Updated 03/10/2021 07:40 AM
Project Title

Waste-to-Energy Plant

Physical Address View project details and contacts
City, State (County) Raleigh, NC   (Wake County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant
Contracting Method Design-Build Firm to Subcontract by Invitation Only.
Project Status Construction Documents, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Manufacturing/Processing Plant, New Construction, 20 Acres.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents