Similar Projects
Aircraft Fuel Storage and Delivery System Material
Post-Bid
Benson, AZ 85602

Gas Line Inspection and Repair
Term Contract
Post-Bid
AZ

Coldwater West Reservoir Structural Modifications and Recoating
Results
Avondale, AZ

Beverly Hills Bolted Steel, Factory Coated Water Storage Tank
Results
$250,000 to $500,000 est. value
Cutter, AZ

East Delos Regulator Station Replacement Project
Post-Bid
Willcox, AZ 85643

Propane/Natural Gas Pipeline Inspection, Maintenance and Repair Services ADC Facilities
Results
Phoenix, AZ 85000

Water and Wastewater Treatment Chemicals
Term Contract
Post-Bid
Phoenix, AZ

CNG Fueling Station Inspection, Maintenance and Repair
Results
Less than $169,772 est. value
Phoenix, AZ 85003

Gasoline and Diesel Fuel Supply - Offsite Refueling Station
Post-Bid
Cottonwood, AZ

Cooper Road Gas Main Replacement, Arizona Farms Road to Magma Road
Results
Less than $502,255 est. value
Mesa, AZ 85211

Airport Fuel Farm Improvements
Post-Bid
Casa Grande, AZ 85122

Landfill Gas, Groundwater and Storm Water Systems Installation, Maintenance, Parts and Service
Term Contract
Results
Glendale, AZ 85301

Gas Line Installation at Taylor Junior High
Post-Bid
Mesa, AZ 85204

Water Treatment Chemical Storage Tanks
Term Contract
Results
Avondale, AZ 85323

AJO Way Fueling Facility Refurbishment
Post-Bid
$600,000 to $800,000 est. value
Tucson, AZ 85713

Last Updated 12/05/2019 10:50 AM
Project Title

Durango Fueling Facility

Physical Address View project details and contacts
City, State (County) Phoenix, AZ   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,385,986
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of multiple structures within a fueling facility, consisting of a pre - fab car wash, 800 sf single story pre -fab office building, fuel storage tank foundations, and concrete light poles.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents