Last Updated | 09/13/2022 06:03 AM |
Project Title | Sewage Pump Station Rehabilitation at Dashields Locks and Dam |
Physical Address | View project details and contacts |
City, State (County) | Moon Twp, PA 15108 (Allegheny County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $239,225 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Award Details Contract Award Date: Sep 09, 2022 Contract Award Number: W911WN22P8007 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: N2AEKDDV3376 Contractor Awarded Name: ADVANCED LOGISTIC PARTNERS INC Contractor Awarded Address: Jarrettsville, MD 21084-1634 USA Base and All Options Value (Total Contract Value): $239225.00 The US Army Corps of Engineers, Pittsburgh District, has a requirement to rehabilitate the existing sewage pump station at Dashields Locks and Dam, Allegheny County, Coraopolis, Pennsylvania. This requirement is to rehabilitate the existing swage pump to include the submersible pumps, motors, motor controls, portions of the discharge piping and all associated pump station hardware exposed to the untreated sewage. The existing concrete sump vault and valve pit will be reused. In general, the tasks required in performance of this contract include: Secure and pump out the vault, dispose of the pumped waste. Clean and sanitize the vault interior in preparation for equipment replacement. Remove existing sewage pumps and install two (2) new Contractor provided vertical electric submersible pump/motor units in accordance with these specifications. Remove the existing 4 diameter discharge pipe from each pump discharge up to and including the discharge check valve and replace the piping in kind in accordance with these specifications. Piping to be supplied by the Contractor. Remove existing pump guide rails and lifting chains and install new Contractor supplied stainless steel pump guides and stainless steel lifting chains of the same size or as appropriate. Remove existing electrical components to include the dual pump motor controller, all cable in the vault, all watertight fittings and vault penetrations, all float switch and alarm actuators located in the vaults and all mounting hardware. Replace all items removed with all new contractor supplied electrical components and stainless steel mounting hardware. Test the completed system. The RFQ Package contains the Solicitation and six (6) Attachments. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtmlsolNo=W911WN22Q8007' to obtain more details.* The estimated cost of the proposed work is between $100,000 and $250,000. Due to the importance of maintaining the schedule for this project, it is requested that all questions regarding this solicitation be submitted by 11:00 AM ET five (5) days prior to the quote due date identified in Block 10 of the SF18. All questions must be in writing and shall be emailed to: Erica.L.Mullen@usace.army.mil and LRP.CONTRACTING@USACE.ARMY.MIL *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |