Similar Projects
Sanitary Sewer Rehabilitation - Barry Rose Service Area (BR-04) - WW2301 - City of Pearland
Infrastructure
Conception
Less than $3,800,000 est. value
Pearland, TX

Veranda / Section 32, 41, Section 4 Park
Infrastructure
Design
$461,000 est. value
Houston, TX 77025

Water Distribution, Sanitary Sewer and Storm Sewer Facilities to serve Churchill Pod 3 Phase 1
Infrastructure
Bidding
$440,000 est. value
Van Alstyne, TX

US 59 Bypass and US 287 Water / Sewer Relocation Services
Infrastructure
Bidding
$310,000 est. value
Corrigan, TX 75939

Sanitary Sewer Replacement
Post-Bid
West Columbia, TX

Sleepy Hollow Street Reconstruction/Sleepy Hollow Waterline/Sleepy Hollow Sanitary Sewer Rehab
Post-Bid
$1,860,000 est. value
Pearland, TX 77581

Woodson Village Rehabilation
Results
$5,055,913 est. value
College Station, TX 77842

Main Sanitary Sewer Lateral Inspection & Repair & Related Work
Results
San Antonio, TX 78249

Wastewater Collection System Rehabilitation and Renewal
Infrastructure
Bidding
$5,300,000 est. value
Houston, TX

Water Oak North Section 6
Post-Bid
TX

Water and Wastewater Main Replacements at Various Locations
Results
$6,481,076 est. value
Dallas, TX 75201

Construction of Water and Sanitary Sewer Rehabilitation West Wind Apartments
Infrastructure
Bidding
$3,000,000 est. value
Fort Worth, TX 76116

Utility Improvements for Prosper Elms Apartments Phase 1
Post-Bid
Aubrey, TX 76227

Grease Traps/Lift Stations and Related Services
Results
La Joya, TX 78560

Installation of a Septic System
Infrastructure
Bidding
$94,000 est. value
Alvin, TX 77511

Reported 06/28/2022 12:00 AM
Project Title

Fy23 Grease Traps Services

Physical Address View project details and contacts
City, State (County) TX 76311   (Wichita County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall be responsible for pumping, cleaning, scraping, deodorizing, transporting, and disposing of waste from grease traps, sand and grit traps, and elevator/hydraulic lift pits as outlined in this Performance Work Statement (PWS). Ensure all grates, covers, grills, and hookups are returned to their original position before departing the area. If a lid is dropped into a trap by the contractor, the contractor is responsible for removing the lid within 4 hours. During the timeframe needed to retrieve the dropped lid, the contractor shall ensure any unsafe area is secured until lid has been retrieved. In addition to the trap, all drainage lines shall be clear of grease, oil, sand, dirt, or other material to ensure they are kept free flowing.

Details

Division 22 - Plumbing, Facility Sanitary Sewerage, Sanitary Waste Piping Specialties, Fats, Oils, and Grease Disposal Systems.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains.
Division 46 - Water and Wastewater Equipment, Oil and Grease Separation and Removal Equipment, Grease Traps.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents