Similar Projects
WSF, Systemwide On-Call Off-Shore Maintenance
Term Contract, Infrastructure
Bidding
$1,000,000 to $2,000,000 est. value
WA

Bellingham Cruise Terminal Pier Repair
Infrastructure
Bidding
$4,400,000 est. value
Bellingham, WA 98225

WDFW - Roses Lake Access Redevelopment Phase Two Rebid - Manson
Infrastructure
Post-Bid
$186,400 est. value
Manson, WA 98831

WDFW - Roses Lake Access Redevelopment Phase 2
Infrastructure
Post-Bid
$186,400 est. value
Manson, WA 98831

Harbor Island Dock Demolition
Demolition
Results
$4,350,636 est. value
Seattle, WA 98134

Engineering Services for Parking Lot And Trailhead Development & Stormwater Management Plan
New Construction, Infrastructure
Results
Blaine, WA 98230

Fishers Landing Employee Area and Rose Besserman Room Refresh Project
Infrastructure
Post-Bid
Vancouver, WA 98683

Wenas Creek Fish Passage and Screening Project
Infrastructure
Results
Yakima, WA

POIT Decking Replacement
Infrastructure
Post-Bid
Bremerton, WA

Boyer Park Marina Dock Replacement and Repair Project
Infrastructure
Results
$4,632,000 est. value
Colfax, WA 99111

Dock Fender System Replacement
Infrastructure
Post-Bid
$1,231,200 to $1,360,800 est. value
Vancouver, WA

Dockside Repair and Maintenance of the Whatcom Chief Ferry
Alteration
Results
$350,000 to $450,000 est. value
Bellingham, WA

Berth 17 Dock Fender System Replacement
New Construction, Demolition
Post-Bid
$1,231,200 to $1,360,800 est. value
Vancouver, WA 98660

15th Street Transient Moorage Dock Replacement
Infrastructure
Results
Tacoma, WA

M.V. Tokitae Drydocking
Infrastructure
Post-Bid
Seattle, WA

Last Updated 05/16/2022 05:25 AM
Project Title

Waterfront Seattle Pier 58 Improvements

Physical Address View project details and contacts
City, State (County) Seattle, WA 98113   (King County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $23,800,000 to $30,800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Estimate : $23,800,000 to $30,800,000 Base Bid; Additive 1: $1,200,000 to $1,450,000; Additive 2: $640,000 to $830,000; Additive 3: $21,000 to $28,000. The project includes marine in-water work including the installation of in-water piling, precast pile caps, precast prestressed deck panels, cast-in-place concrete, cast-in-place concrete topping slab with architectural finishes, in-water habitat improvements, electrical and mechanical systems, lighting, fire suppression systems, other utilities, grated steel pedestrian walkway, expansion joint plates, fountain, landscaping, play area, and railing. Project also includes optional award elements including timber pier demolition and pile removal, and cathodic protection systems.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents