Similar Projects
High-Tech Logistics Park / Mobile
New Construction, Infrastructure
Conception
$19,000,000 CJ est. value
Mobile, AL 36602

Canfor Southern Pines Sawmill Complex / Mobile County
New Construction, Infrastructure
Design
$210,000,000 CJ est. value
Axis, AL 36505

Alabama Cruise Terminal SPBB Gangway Improvements
Infrastructure
Bidding
$700,000 CJ est. value
Mobile, AL 36602

RFP - I-10 Mobile River Bridge Project
New Construction, Infrastructure
Bidding
$1,600,000,000 CJ est. value
Mobile, AL 36602

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

BFM RW 14 Culvert Extension and Tree Clearing
Infrastructure
Post-Bid
Mobile, AL 36615

Old Highway 43 - RRR
Results
AL

Water Supply Improvements Contract A -R. O. Water Treatment Plant (0.250 MGD) Contract B --R. O. Treatment Equipment
New Construction, Infrastructure
Results
$2,145,057 CJ est. value
Mobile, AL 36602

Murphy Oil #6987/7817 / Semmes
Demolition, New Construction, Infrastructure - 1,400 SF
Construction
$2,000,000 CJ est. value
Semmes, AL 36575

FGP Holdings Manufacturing Renovation
Addition, Demolition, Infrastructure - 100,000 SF
Pending Verification
$20,000,000 CJ est. value
Mobile, AL 36606

Austal USA Auxiliary Floating Dry Dock / Mobile
Infrastructure
Pending Verification
$128,100,000 CJ est. value
Mobile, AL 36602

Langan Park Amphitheater Pavilion & Restroom and Public Safety Memorial Park Restroom, Skateboard Park & Splashpad
Infrastructure
Bidding
$450,000 CJ est. value
Mobile, AL 36602

2021 Street Resurfacing
Infrastructure
Post-Bid
Citronelle, AL

Texas Street Infrastructure Rehabilitation
Results
$5,578,877 est. value
Mobile, AL 36628

Medical School Building Expansion and Renovation - University of South Alabama
New Construction, Infrastructure
Pending Verification
$140,000,000 CJ est. value
Mobile, AL 36608

Last Updated 10/28/2022 08:38 AM
Project Title

Micro-Milling, Resurfacing, and Traffic Stripe on I-10

Physical Address View project details and contacts
City, State (County) Mobile, AL 36605   (Mobile County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $9,169,472 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 25, 2022, the project has not been awarded. A timeline for award has not been confirmed. County : Mobile Constructing the Micro-Milling, Resurfacing, and Traffic Stripe on I-10 from a point 1.360 miles east of the SR-193 Interchange (MP 18.467) to the Wallace Tunnel (MP 26.651) in Mobile. Length 8.272 mi. The Bracket Estimate on this project is from $5,832,333 to $7,128,407 . Contract Time: 120 Working Days If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 010 - Micro-Milling, Resurfacing, and Traffic Stripe on I-10 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents