Similar Projects
Intersect Modif - SH 412B
Infrastructure
Conception
$4,120,000 CJ est. value
Chouteau, OK 74337

Intersect Modif - SH 412B
Infrastructure
Conception
$4,120,000 CJ est. value
Chouteau, OK 74337

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Pavement Rehabilitation - US 69
Infrastructure
Design
$16,553,256 CJ est. value
Pryor, OK 74361

Cherokee Nation - Salina Health Clinic - Bid Package #1
Infrastructure
Sub-Bidding
$750,000 CJ est. value
Salina, OK 74365

Cherokee Nation - Salina Health Clinic - Bid Package #1
Infrastructure
Sub-Bidding
$750,000 CJ est. value
Salina, OK 74365

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Slabjacking and Subsealing Services
Infrastructure
Results

Right of Way Clearance - Sh-28
Infrastructure
Results
OK

Pavement Rehabilitation - SH 412
Infrastructure
Design
$9,900,082 CJ est. value
Locust Grove, OK 74352

RFQ D/B - KC-46A 3-Bay Maintenance Hangar at Tinker AFB, Oklahoma
New Construction, Infrastructure
Post-Bid
$148,925,456 CJ est. value
Oklahoma City, OK 73145

Salina Collection System and WWTP
Renovation, Infrastructure
Results
$2,489,400 CJ est. value
Salina, OK 74365

Intersect Modif - SH 412
Infrastructure
Design
$530,000 CJ est. value
Locust Grove, OK 74352

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Last Updated 03/28/2023 04:13 AM
Project Title

Grade, Drain and Surface - US 69

Physical Address View project details and contacts
City, State (County) Pryor, OK 74361   (Mayes County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected April 2025
Bids Due View project details and contacts
Estimated Value $17,315,900 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Us 69: Begin at Mayes/wagoner Cl and Extend North Approx 6.7 Mi Sb As of March 28, 2023, the project is in Design status. Anticipated letting month/year is August, 2024. Length : 9.160 Mi OKDOT - Grade, Drain and Surface - US 69 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents