Similar Projects
Heritage, Caughey, Lancaster, Asbury, Peach Street and Greenley Modifications, Grubb and Echo Hills Pump Station Improvements
Renovation
Bidding
$450,000 est. value
PA

Chapel View Pump Station Improvements - General (Contract No. 1) and Electrical (Contract No. 2)
Renovation
Bidding
$713,000 est. value
Red Lion, PA 17356

Flowers Road Pump Station Construction General/Mechanical
Post-Bid
Derry, PA 15627

Jeannette Sewage Treatment Plant Pump Station Upgrade General / Mechanical Construction
Post-Bid
New Stanton, PA 15672

Long Term Control Plan Project 2018 Lift Station Improvements - General Construction
Results
Rochester, PA 15074

Southeast Pump Station - General Construction
Results
$350,000 to $500,000 est. value
Allenwood, Elimsport, PA 17810

Sixth and Canal Pump Station Phase II Upgrade Project - Contract 1 - General Construction
Construction
$6,000,000 to $8,500,000 est. value
Reading, PA 19601

Maple Grove Sewage Pumping Station and Interceptor Expansion - General Construction
Construction
$1,400,000 est. value
Lancaster, PA 17603

Pump Station Control Systems
Renovation
Bidding
$40,000 est. value
Coatesville, PA

Tanker Filling Station
Post-Bid
Renovo, PA

Furnishing 35 Grinder Pumps and 2 Spare Grinder Pump Cores
Results
Johnstown, PA 15904

East Halls Pump Station Upgrades
New Construction, Demolition
Construction
$1,980,000 est. value
University Park, PA

Thompson Road Pump Station Screen Project Contract No. 1 - General Construction Contract No. 2 - Electrical Work
Renovation
Bidding
$300,000 est. value
Hadley, PA 16130

Patch Pump Station Upgrades Project
Post-Bid
$120,000 est. value
Black Lick, PA

Sheffield Terrace Booster Station Replacement
Results
Less than $895,850 est. value
Aliquippa, PA 15001

Reported 05/27/2022 12:00 AM
Project Title

Pump Station No. 13 Replacement Project - Contract No. 1 General/Process Mechanical, Contract No. 2 - Electrical

Physical Address View project details and contacts
City, State (County) Lititz, PA 17543   (Lancaster County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected November 2022
Bids Due View project details and contacts
Estimated Value $1,200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Contract No. 1 consists of construction of a new wastewater pump station, complete with precast concrete wet well and valve vault, new precast manholes, gravity sanitary sewer main, sanitary sewer force main, installation of new pumps, piping, valving, instrumentation, decommissioning and demolition of the existing wastewater pump station, general site restoration, and bypass pumping. Contract No. 2 consists of construction of a new electrical service and meter base, power and control raceway wiring, new generator and automatic transfer switch, panels, switches, miscellaneous electrical devices, wiring, instrumentation, and lighting. Note: The Owner intends to pre-purchase the ductile iron pipe, generator, and automatic transfer switch. Pre-purchased equipment and materials will be consigned to the contractor for installation.

Details

Lift and Pump Stations, New Construction.
Division 01 - General Requirements, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Amendments, Change Orders, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Codes, Laws, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Temporary Water, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Mobilization, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Spare Parts, Life Cycle Activities, Commissioning.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete.
Division 04 - Masonry, Stone Assemblies.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Heavy Timber Construction, Heavy Timber Trusses.
Division 07 - Thermal and Moisture Protection, Roofing and Siding Panels, Roof and Wall Specialties and Accessories, Roof Accessories.
Division 08 - Openings, Hardware.
Division 09 - Finishes, Painting and Coating, Painting.
Division 10 - Specialties, Information Specialties, Signage.
Division 14 - Conveying Equipment, Lifts.
Division 22 - Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts.
Division 26 - Electrical, Common Work Results for Electrical, Low-Voltage Switchgear, Packaged Generator Assemblies, Facility Lightning Protection, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Rock Removal, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Stabilization Measures for Erosion and Sedimentation Control.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Shrubs, Trees.
Division 33 - Utilities, Common Work Results for Utilities, Electrical Utilities, Utility Substations.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Dredging, Coastal Construction, Shoreline Protection.
Division 40 - Process Integration, Common Work Results for Process Integration, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Lifts.
Division 43 - Process Gas and Liquid Handling, Purification, and Storage Equipment, Liquid Handling Equipment.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents